• Structure tasks by left-clicking on the left box margin and dragging the box to the required position.
    • When the boxes are moved, the specification in the node field, which visualizes the number of boxes per level, will be updated automatically.
  • Click on the Generate WBS code button (the wheel symbol below the project bar).
    • The WBS code is generated automatically for every task in the WBS code field in accordance with the structure. Thus, the WBS code is both an identifier for single elements in the schedule and an indicator of the hierarchical structure.