DI065086 Simulate project
Parameter which serves to (de)activate the planning objects in the simulation (for display in the form of bars below the scale and for consideration in utilization diagrams)
The parameter can be edited in the following module by users with modification rights:
DI065252 OLE overload entire project
Traffic light which shows whether there is an overload (red) for the planning object in the selected simulation period or not (green). Cf.: the
OLE overload in project traffic light shows whether the planning object generally has an overload (red) or not (green).
DI064168 OLE manager’s project estimate
Symbol (thumb) for the estimate of the status of the planning object in the portfolio by the portfolio manager at the time of creation of the selected status report
DI064331 Priority
Defines the positioning order of the planning object in the utilization diagram of a simulation (example for low priority: visualization of the planning object further up creates an overload first)
DI064332 Requested start
Requested start date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064333 Requested end
Requested end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064334 Simulation: start
Simulated start date of the planning object. If the planning object has not been simulated yet, the simulated start date is equal to the calculated start date of the planning object from the status report which was used as source for the simulation.
DI064335 Simulation: end
Simulated end date of the planning object. If the planning object has not been simulated yet, the simulated end date is equal to the calculated end date of the planning object from the status report which was used as source for the simulation.
DI064340 Color in simulation
Color of the planning object in the Gantt chart and in the utilization diagram of a simulation/road map
DI064345 Actual values available
Specifies whether there already is actual data in a planning object
DI064346 OLE overload in project
Traffic light which signalizes the existence (red) or nonexistence (green) of overload in the planning object in the period selected for simulation. Cf. the
OLE overload in project traffic light which informs you about overload in the entire planning object.
DI064485 Bar: date simulation
Bar for simulated start and end dates of the planning objects. Before the dates have been simulated (changed), they are equal to the calculated dates. As a result, the bar for simulated dates completely overlays the bar for calculated dates.
DI064486 Bar: Actual start - Time recording date
Bar for the visualization of the interval between actual start date and last time recording date of the planning object from the status report which was used as source for the simulation
DI064487 Bar: Calculated dates
Bar for the visualization of the interval between the calculated dates of the planning object from the status report which was used as source for the simulation
DI064488 Bar: Requested dates
Bar for the visualization of the interval between the requested dates of the planning object. The requested dates stem from the status report which was used as source for the simulation.
DI064489 Calc. start
Calculated end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064490 Calc. end
Calculated end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064502 Actual start
Actual start date (first time recording date) of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064503 Latest time recording date
Latest (last) time recording date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.
DI064520 Project type name
Name of the planning object type, e. g. project, proposal, etc.
Comment of the portfolio manager on the planning object at the time of creation of the portfolio status report
DI062346 OLE project estimate
Symbol (thumb) for the estimate of the status of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062349 OLE date estimate
Symbol (thumb) for the estimate of the dates of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062347 OLE cost estimate
Symbol (thumb) for the estimate of the costs of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062348 OLE effort estimate
Symbol (thumb) for the estimate of the effort of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062351 OLE quality estimate
Symbol (thumb) for the estimate of the quality of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062352 OLE risks/opportunities estimate
Symbol (thumb) for the visualization of the risks and opportunities of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.
DI062207 Project status
ID of the planning object status report which was assigned to the planning object at the time of creation of the selected portfolio status report
DI062338 Project name
Name of the planning object in the respective portfolio status report or in the simulation
DI062987 Report status
Date on which the selected portfolio status report was created or released as a monthly report (the date refers to the date of the most current status)
DI062204 Status report ID
ID of the selected portfolio status report
DI062339 Project estimate
Numeric estimate value for the total status of the portfolio which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062343 Dates estimate
Numeric estimate value for the dates of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062340 Cost estimate
Numeric estimate value for the costs of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062341 Effort estimate
Numeric estimate value for the effort of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062344 Quality estimate
Numeric estimate value for the quality of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062345 Risks/opportunities estimate
Numeric estimate value for the costs of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding
estimate symbol. The value is copied from the
DI of the same name in the current planning (DT870
Portfolio) and is hidden in user modules.
DI062335 Project
ID of the selected planning object in the selected portfolio status report or in the simulation
DI062205 Portfolio ID
ID of the portfolio for which the selected status report was created
DI062622 Top project
DI062336 Project manager
Name of the selected planning object in the selected portfolio status report or in the simulation
DI062337 Project manager ID
Code (ID) of the manager of the selected planning object in the selected portfolio status report or in the simulation
DI062370 Number
Number of the planning objects in the selected group (type)
DI062371 Project type name
Name of the planning object type in the selected group