DT461 Project
Below, you will find descriptions of the project parameters (project data fields) which are used in standard modules.
DI041317 Project
Functional ID of the planning object (project/program/proposal/idea). It is generated automatically (copied from the technical project ID). Unlike the technical project ID, the functional ID can be changed afterwards (in the Project Core Data module) if necessary.
See notes under Project ID
DI001001 Project ID
Technical ID of the planning object (project/program/proposal/idea). It is generated automatically. Unlike the functional ID, it cannot be changed manually in the project DI.
Notes on customizing with functional and technical IDs
- In PLANTA standard
- only the functional ID is displayed in most modules (the technical ID is hidden by default and the Data field option and Filter criterion parameters are deactivated)
- @L variables are always set to the technical ID since
- only these data items have an index that speeds up the search.
- Modules with this preset are usually embedded in workflows in which the successor modules also work with it (not only as a filter, but also in the Python macros for accessing the database).
- In modules that have a filter with @L on main or subproject, no filters at project level are available to the user (the Filter criterion parameter is deactivated for all project fields).
- PLANTA recommends that you consider this logic for individual customizing.
DI000690 Project name
Name of the planning object (project/program/proposal/idea/)
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Program Core Data in the Basic data area
- Idea Core Data in the Basic data area
- Edit Planning Objects
DI000141 Locked
This parameter determines whether the planning object is locked for working time recording.
Values
- : Reporting of actual effort or actual hours not possible.
- : Reporting of actual effort or actual hours possible.
Details
- When a planning object is created, the Locked flag is set automatically so that no reporting hours can be executed unintentionally for the planning object during the initial planning phase.
- If work reporting is to be enabled for a planning object, the Locked checkbox must be deactivated.
Note on structures projects
- The value (activated/deactivated) is neither inherited from main project to subproject nor the other way around. It can be changed on project level. Changes to subprojects, however, can only be made by users that possess multi-project manager or multi-portfolio manager rights.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Attributes/parameters area
- Proposal Core Data in the Attributes/parameters area
DI009494 Posting type ID
Code (ID) of the posting type of the planning object. For description, see DI056881 Posting type name.
DI056881 Posting type
Name of the posting type of the planning object. The Posting type parameter specifies up to which date the employees can post actual effort to the project. In input mode, a listbox for selection of a resource person is displayed on the respective field.
In PLANTA, actual posting means the recording of actual hours in the course of Time Recording as well as the recording of actual costs (cost which have actually incurred) in the Post Costs module and in the Post Revenues module.
Values
- 0 - Actual postings up to the end of the current week: Recording of actual postings, actual costs, and actual revenues up to the last day of the current week.
- 1 - Actual postings also into the future (overhead costs,...) Reporting of actual hours, actual costs, and actual revenues is also possible for future dates.
- 2 - ... - This value is not preset by default and can be specified by a user with customizing rights.
Details
- New projects are preset with Posting type = "0".
Note on structures projects
- Each new subproject in a project structure automatically inherits the posting type (upon creation) from its immediate parent project. The value can only be changed in the main project. If you try to change values on a subproject, the following message is displayed: The posting type can only be changed in the main project.
The parameter can be edited in the following modules by users with modification rights:
DI001042 Status ID
Code (ID) of the status of the planning object. For description, see DI041499
DI041499 Status
Name of the planning object status. In input mode, a listbox for selection of a status is displayed on the respective field.
Values
- Template (0)
- Active (1)
- Inactive (2)
- Archive (9)
Details
- New planning objects are preset with status = Active.
- For planning objects with Status ≠ "Active" (e.g. project templates which are used for copying) the calculation of schedules is not possible (neither as single calculation nor in the course of a replanning)
- Difference between "Archive" and "Inactive"
- The tasks of the archived projects are not counted in the license level (task limit). The tasks of inactive projects, on the contrary, are counted in the license level. Inactive projects are only deactivated temporarily and can be reactivated at a later point in time.
- Archived projects cannot be edited by regular users (regardless of their rights). All fields (except the Status field itself) are "output" and all editing functions are switched off. Only users with customizer rights still have modification rights for archived projects. Inactive projects remain editable to regular users. However, they are only available in particular views.
- Before the status of a loaded planning object can be changed from "Active" to "Archive" or "Inactive", a final scheduling has to be carried out for the planning object and subsequently it must be unloaded. An info message indicates this.
- The status of programs can only be changed from "Active" to "Archive" or "Inactive" if all assigned projects have the "Archive" or "Inactive" status accordingly.
- If an archived planning object is opened, no current milestones will be displayed in the graphic in the project dashboard (program dashboard), but only the milestones from the baseline and from the active status report. Reason: in the graphic, the calculated dates are required for the x axis. However, since in the current planning there are no more calculated dates due to the unloading which took place during archiving, the milestones of the current planning cannot be displayed in the graphic.
- Archived planning objects are no longer scheduled, however, their effort and cost values will still be taken into account in the program.
- If a project with external links from/to other projects is set to "Inactive" or "Archive", the external links will be converted to links with active external task parameter.
- If a synchronized project is archived in PLANTA project, the corresponding project in PLANTA pulse is archived as well.
Note on structures projects
- Each new subproject in a project structure automatically inherits the status (upon creation) from its immediate parent project. The value can only be changed in the main project. If you try to change values on a subproject, the following message is displayed: The project status can only be changed for main project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Attributes/parameters area
- Program Core Data in the Attributes/parameters area
- Edit Planning Objects (for all planning objects)
Note
- In the Proposal Core Data, the parameter is only displayed but cannot be changed.
- The status of ideas and proposals can only be changed in the Edit Planning Objects module.
DI056873 Status
Name of the planning object status. For description, see DI041499
DI059323 WBS changes locked
Determines whether the generation of a WBS code or the alteration of an existing WBS code are allowed for the selected project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Attributes/parameters area
- Proposal Core Data in the Attributes/parameters area
- Program Core Data in the Attributes/parameters area
DI000260 Short name
Short description of the project/proposal/idea/program
DI000264 WBS code*
Work break down structure code
Details
DI023220 Type ID
Code (ID) of the planning object type. For description, see DI057969
DI057969 Type
Name of the type of the planning object. The parameter determines whether the planning object is a
- project (0)
- proposal (1)
- idea (2)
- request (10)
- program (30)
.
The type is automatically set in type-specific creation of the planning object. A retrospective conversion of one type into another via the Type parameter can only be carried out by PM administrators in the Edit Planning Objects module.
DI057968 Type
Name of the type of the planning object. For description, see DI057969
DI001037 Planned effort
Planned effort of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project: Planned effort = sum of Planned effort of all tasks of the current project and of all of its subprojects (if there are any)
- Task: Planned effort = sum of Planned effort of all resources assigned to the task.
- Resource assignment: Planned effort = Remaining effort, as long as no Actual start has been set. As soon as Actual start has been set, the Planned effort will no longer be changed in the calculation process; however, it can still be adjusted manually.
- Task: Planned effort = sum of Planned effort of all resources assigned to the task.
Note
- Planned effort is only summarized from resource assignment (DT466) to the task (DT463) and subsequently to the project (DT461) if the Effort summarization checkbox is activated in the Resource Data Sheet.
DI001038 Actual effort
Actual effort of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project: Actual effort = sum of Actual effort of all tasks of the project and of all of its subprojects (if there are any)
- Task: Actual effort = sum of Actual effort of all resources assigned to the task.
- Resource assignment: Actual effort = sum of all Actual load values (load per day) of the resource assigned to the task.
- Load: Manual input in the Actual load field.
- Resource assignment: Actual effort = sum of all Actual load values (load per day) of the resource assigned to the task.
- Task: Actual effort = sum of Actual effort of all resources assigned to the task.
Note
- Actual effort is only summarized from resource assignment (DT466) to the task (DT463) and subsequently to the project (DT461) if the Effort summarization checkbox is activated in the Resource Data Sheet.
DI001039 Remaining effort
Remaining effort of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project: Remaining effort = sum of Remaining effort of all tasks of the project and of all of its subprojects (if there are any)
- Task: Remaining effort = sum of Remaining effort of all resources assigned to the task.
- Resource assignment: Remaining Effort is filled manually if the project has not been started yet (if there is no actual start). ( Exception: Ressource assignment with MAN load profile ). Remaining Effort is filled manually if the project has not been started yet (if there is no actual start). Remaining Effort = Remaining Effort before recording hours worked - Actual effort .
- Task: Remaining effort = sum of Remaining effort of all resources assigned to the task.
Note
- Remaining effort is only summarized from resource assignment (DT466) to the task (DT463) and subsequently to the project (DT461) if the Effort summarization checkbox is activated in the Resource Data Sheet.
DI000687 Total effort
Total effort of the planning object. The value is determined during scheduling as a sum of actual and remaining (manual input not possible).
Calculation
- Total effort = Actual effort of the project and of all of its subprojects + Remaining effort of the project and of all of its subprojects
DI000661 Planned costs
Planned costs of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project: Planned costs = sum of Planned costs of all tasks of the project and of all of its subprojects (if there are any)
- Task: Planned costs = sum of Planned costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Planned revenues.
- Resource assignment: Planned costs = sum of all Planned cost values per day of the resource assigned to the task.
- Load: Planned costs per day of the resource assigned to the task. On this level, the actual cost calculation takes place.
- Resource assignment: Planned costs = sum of all Planned cost values per day of the resource assigned to the task.
- Task: Planned costs = sum of Planned costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Planned revenues.
DI000662 Actual costs
Actual costs of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project : Actual costs = sum of Actual costs of all tasks of the project and of all of its subprojects (if there are any)
- Task: Actual costs = sum of Actual costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Actual revenues.
- Resource assignment: Actual costs = sum of all Actual cost values of all resources assigned to the task.
- Load: Actual costs per day of the resource assigned to the task. On this level, the actual cost calculation takes place.
- Resource assignment: Actual costs = sum of all Actual cost values of all resources assigned to the task.
- Task: Actual costs = sum of Actual costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Actual revenues.
DI000673 Remaining costs
Remaining costs of the planning object. The value is determined (summarized) from the values of the child areas (levels) during scheduling. Manual input is not possible. See calculation/summarization
Calculation/summarization
- Project : Rem. costs = sum of the Rem. costs of all tasks of the current project and of all of its subprojects (if there are any)
- Task : Remaining costs = sum of Remaining costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Remaining revenues.
- Resource assignment : Remaining costs = sum of all Remaining cost values of all resources assigned to the task per day.
- Load: Remaining costs per day of the resource assigned to the task. On this level, the actual cost calculation takes place.
- Resource assignment : Remaining costs = sum of all Remaining cost values of all resources assigned to the task per day.
- Task : Remaining costs = sum of Remaining costs of all resources assigned to the task (except revenue resources).
For revenue resources, see Remaining revenues.
DI000674 Total costs
Total Costs of the planning object. The value is determined in scheduling as a sum of actual and remaining values (manual input not possible).
Calculation
- Total costs = Actual costs + Rem. costs
DI000634 Cost budget
Budget specifications for costs. Cost budget is planned/allocated in the Budget module (DT281) and the value is fetched to DI000634 (DT461) via Python value range.
Details
- The values are summarized upwards to the main project via the structure if there are entries in subprojects.
DI000638 Deviation costs: planned - budget
Absolute deviation of planned costs from the cost budget
Details
- Deviation > 0 means: Budget overrun!
Calculation via value range
DI000641 % deviation costs: planned - budget
Percentage deviation of planned costs from the cost budget
Details
- Deviation > 0 means: Budget overrun!
Calculation via value range
- (Planned costs - Cost budget) / Cost budget x 100
DI000658 Deviation costs: total - budget
Absolute deviation of total costs from the cost budget
Details
- Depending on whether the Total costs - budget deviation value is positive or negative, the value is colored red, yellow, or green.
- Budget undercut: green
- Deviation > 0 means: Budget overrun!
- Budget strongly overrun: red
- Budget slightly overrun: yellow
Calculation via value range
DI000660 % deviation costs: total - budget
Percentage deviation of the total costs from the cost budget of the current planning.
Details
- Deviation > 0 means: Budget overrun!
Calculation via value range
- (Total costs - Cost budgett) / Cost budget x 100
DI000676 Deviation costs: total - planned
Absolute deviation of total costs from planned costs
Calculation via value range
DI000686 % deviation costs: total - planned
Percentage deviation of total costs from planned costs
Calculation via value range
- (Total costs - Planned costs) / Planned costs x 100
DI000687 Total effort
Total effort of the project (program, proposal, idea)
Calculation
- Actual effort of the project and of all of its subprojects + Remaining effort of the project and of all subprojects
DI000688 Deviation effort: total - planned
Absolute deviation of total effort from planned effort
Calculation
DI000689 % deviation effort: total - planned
Percentage deviation of total effort from planned effort
Calculation
- (Total effort - Planned effort) / Planned effort x 100
DI000692 Group 1
Parameter for grouping the planning objects. In the user modules, the respective field is named Project type.
Details
- In PLANTA standard, this field is preset with a listbox the content of which can be adjusted via the Miscellaneous Listbox Values master data module.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Idea Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
DI000693 Group 2
Additional parameter for grouping planning objects The description and listing of the modules for editing are the same as for Group 1
DI000694 Group 3
Additional parameter for grouping planning objects The description and listing of the modules for editing are the same as for Group 1
DI001003 Parent project ID
ID of the parent project in a project structure. When a project structure is created, the ID of the parent project is automatically entered for the child project when saving.
See also: Structure Project / Subprojects |
DI001004 Structure task ID
Here, the ID of the structure task from the parent project is automatically entered for the child project when a project structure is created. A structure task is a task which connects a parent project to a subproject.
Details
- After projects have been structured and calculated, a structure task is created automatically in each parent project.
- In standard, structure tasks are hidden in all concerned modules by default and cannot be unhidden by the user. This is to be observed for individual customizing as well.
- The Structure task parameter defines whether a task is a normal or a structure task.
DI001005 Created on
When a record is created, the creation date is automatically entered here.
DI001006 Changed on
When a record is modified, the modification date is automatically entered here.
DI001008 Created by
When a record is created, the ID (code) of the logged-on user is automatically entered in this field. The creating user is also the owner of a record.
DI001009 Changed by
When a record is modified, the ID (code) of the logged-on user is automatically entered in this field.
DI001014 Code ID
Code (ID) of the code of the planning object. For description, see DI056883.
DI056883 Code
Name of the code of the planning object. In input mode, a listbox for selection of a code is displayed on the respective field.
In PLANTA, codes serve to organize planning objects. In PLANTA standard, the code of the planning objects (or the symbol stored for the respective code) is taken into account in the visualization of the planning object date bars (e.g. in the Projects module) or in utilization diagrams.
Values
- A - A projects
- B - B projects
- C - C projects
- D - Other projects
- E - New projects
All newly created planning objects are set to code = E (new projects) by default
Technical details on utilization diagram
- In PLANTA standard, the planning object utilization is visualized in utilization diagrams according to the code. However, the planning object codes are not directly taken into account but via respective model parameters.
- Individual planning object codes are assigned to the Utilization code 1 - 4 model parameters which in turn can be written in the Summarized planned code 1 to Summarized planned code 4 period parameters, on the basis of which the utilization diagrams are visualized.
- Planning object codes that are not assigned to the Utilization code (1-4) model parameters are summed up in the Summarized planned code 5 period parameter.
- Since utilization diagrams in PLANTA can only consider 5 codes, PLANTA recommends to use 5 planning codes accordingly (as is the case in standard). If more than 5 planning object codes are used regardless (e.g. for the purpose of further project analysis), they are combined into a code in utilization diagrams and visualized with the same symbol.
Note on structures projects
- Each new subproject in a project structure automatically inherits the code (upon creation) from its immediate parent project.
Caution
- If you want to have the codes changed or extended, please consult your PLANTA contact person.
The parameter can be edited by users with modification rights in the following modules (assignment of the codes to planning objects):
- Project Core Data in the Basic data (project) area
- Proposal Core Data in the Basic data (proposal) area
- Edit Planning Objects (all: projects, ideas, proposals, programs, requests)
DI001015 Priority
Priority of the planning object
Details
- You can increase the importance of the planning object using a numeric code to define the priority.
- Priority controls the sequence in which the resources assigned to the projects are loaded during replanning (calculation of the schedules of all projects).
- For newly created projects, the priority is set to the lowest priority. It can be adjusted.
Permitted values
- 0: highest priority;
- 1: second highest priority, etc.
Technical details
- The value range of the field checks for the @G296 global variable via which you can set the maximum priority value that can be entered.
- If you, e.g., want to work with priority values from 0 to 10, you should enter 10 in the variable. Numbers up to 999 are permitted.
- In PLANTA Standard, the maximum permitted value is preset by default.
Note on structures projects
- Each new subproject in a project structure automatically inherits the priority (upon creation) from its immediate parent project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
DI001019 Requested start
Required start date of the planning object. It is the start date for all tasks without predecessor and without own requested dates. The project requested start will be taken into account if no other conditions (e.g. taking into account of the 'today' line) conflict with it. It is also valid if actual data has already been recorded on tasks.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Key dates area
- Proposal Core Data in the Key dates area
- Idea Core Data in the Key dates area
- Program Core Data in the Key dates area
- Edit Planning Objects
DI001020 Requested end
Required end date date of the planning object
Details
- Depending on the project requested dates for float model parameter, the calculation of float times in projects is based on this parameter.
- If the calculated lead time of the project is shorter than the time between Req. start of the project and Req. end of the project, all tasks will receive additional float.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Key dates area
- Proposal Core Data in the Key dates area
- Idea Core Data in the Key dates area
- Program Core Data in the Key dates area
- Edit Planning Objects
DI001023 Calc. start
Calculated start date of the project (proposal, idea, or program).. The value is determined during scheduling.
Calculation
- Earliest calculated start date of all tasks of the project and all subprojects (if there are any)
DI001024 Calc. end
Calculated end date of the project (proposal, idea, or program).. The value is determined during scheduling.
Calculation
- Latest calculated end date of all tasks of the project and all subprojects (if there is any)
DI001025 Actual start
Actual start date of the project (proposal, idea, or program).. The value is determined during scheduling.
Calculation
- Earliest actual start date of all tasks of the project and all subprojects (if there are any)
DI001026 Actual end
Actual end date of the project (proposal, idea, or program).. The value is determined during scheduling.
Calculation
- Latest actual end of all tasks of the project and the subprojects (if available), if all tasks are completed.
Project duration
If Actual start of the project = 0 (project is being planned) | If Actual start of the project > 0 (project has already started) | |
---|---|---|
DI001034 Planned duration | If requested date is set: Requested end - Requested start Otherwise: Calc. end - Calc. start | Unchanged after first Scheduling (analogous to Planned task duration). Although changes can still be made in the Planned task duration after project start, they will not be written in the Planned project duration in the next calculation. |
DI001035 Actual duration | 0 | Time recording date - Actual start (in analogy to the calculation of Actual task duration). |
DI001036 Remaining duration | calc. end - Calc. start | Initial Remaining duration - change in the Actual duration |
DI023415 Total duration | Actual duration + Remaining duration | Actual duration + Remaining duration |
Notes
- Project durations are calculated on the basis of work days (Work = ). This means that the number of days with Work = (weekends, public holidays, company holidays) will additionally be subtracted from the results of the above described subtractions. The calculation accesses the calendar which is entered in the @G150 global variable.
- If the today line is inactive or fixed, it is possible that the Remaining task duration overlaps the Actual task duration (e.g.: Actual duration ended the day before but there is still remaining effort in the last week). Here, no plausible total project duration can be calculated.
- If the today line is inactive, the settings in the Split parameter are not taken into account in the project duration calculation.
DI001481 Time recording date
Date on which the last time recording was carried out for the project. The date is determined during scheduling.
Calculation
- The last (latest) Time recording date of all tasks of the project
DI001043 Network cycle
Parameter which signalizes that there is a cycle in the project.
Details
- If the scheduling run is aborted due to a cycle in the network, this checkbox will be activated. After the cycle has been removed, the checkbox will be deactivated in the follow-up scheduling.
See also: Cycle Search module, Task with cycle parameter |
DI001044 Loaded
The parameter indicates whether a scheduling (calculation of the schedule) of the planning object has been carried out.
Values
- - The schedule has been calculated.
- - Unloading has been carried out or the schedule has not yet been calculated.
DI001045 Last scheduling date
Date of the last scheduling of the planning object
DI001048 Number of tasks
Number of tasks of the project
Notes
- The value is determined during scheduling.
- For archived projects, this field is not filled (i.e. tasks of archived projects are not counted).
- Structure tasks are not included in the count.
DI002345 Number of tasks
Number of tasks of the project
Notes
- Unlike the parameter of the same name, DI001048
- this parameter is also filled for archived projects (i.e. tasks of archived projects are counted).
- Structure tasks are not included in the count.
DI001049 Number of links
Number of Link tasks / links of the project. The counting only includes the links relevant for scheduling, i.e. internal links and external links (incoming and outgoing). External tasks are not included in the counting.
- Cf. Number of links task parameter
Details
- The value is automatically determined during scheduling of the planning object.
DI001050 Last scheduling date
Date on which the last scheduling was carried out.
DI001052 Main project ID
Code (ID) of the main project in a project structure
Remarks
- If no project structure is available, the main project ID (DT001052) equates to the project ID (DI001001).
- Projects with Level = 0 are always main projects at the same time.
DI001053 Level
Project level. Both initial setting and update of the value take place immediately after the structure has been changed and saved. No scheduling is required.
Values
- 0: Main project (top level)
- 1: Subproject of the 1st level, etc.
DI001061 Customer
Customer of the project
Note on structures projects
- Each new subproject in a project structure automatically inherits the customer (upon creation) from its immediate parent project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Idea Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
DI001062 Manager ID
Code (ID) of the project (idea, proposal, program, request) manager. For details, see Manager
DI006514 Manager
Name of the project (idea, proposal, program, request) manager
DI034520 Manager
Name of the project (idea, proposal, program, request) manager. In input mode, a listbox for selection of a manager is displayed on the respective field.
Notes
- When creating new planning objects, the current creating user is entered as a manager in the respective core data module (Proposal Core Data, Proposal Core Data, Program Core Data) but can be replaced by another person immediately after creation. For ideas, the Manager field is not contained in the core data, so that the idea manager can only be changed in the Edit Planning Objects module in the Ideas module variant.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
DI007817 Manager: parent project
Name of the manager of the parent project
DI007822 E-mail manager: parent project
E-mail address of the manager of the parent project
DI007823 Main project manager ID
Code (ID) of the main project manager
DI006864 Main project manager
Name of the main project manager
DI007821 E-mail main project manager
E-mail address of the main project manager.
DI007824 Manager ID: parent project
Code (ID) of the manager of the parent project
DI006545 E-mail
E-mail of the project manager
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
DI001063 Client
Contact person at the client
Note on structures projects
- Each new subproject in a project structure automatically inherits the customer manager (upon creation) from its immediate parent project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Idea Core Data in the Basic data area
- Program Core Data in the Basic data area
DI001296 Dev.: project end dates: calc. end - requested end
Absolute deviation of the project end dates calculated in scheduling (Calc. end from Requested end) in days.
DI008143 Dev.: MMS end dates: calc. end - requested end
Absolute deviation of the master milestone end dates calculated in scheduling (Calc. end from Requested end) in days. The highest deviation value from all master milestones is visualized.
DI002051 Bar: calculated dates (traffic light)
Bar (with a traffic light function) for the visualization of the interval between the calculated dates (Calc. start and Calc. end) of the project (program, proposal, idea).
DI002052 Bar: requested dates
Bar for the visualization of the interval between the requested dates (Requested start and Requested end) of the project (program, proposal, idea)
DI002055 Bar: actual dates
Bar for the visualization of the interval between the actual dates (Actual start and Actual end) of the project (proposal, idea, program)
DI002088 Bar: Actual start - Time recording date
Bar for the visualization of the time interval between Actual start date and Last time recording date of the project (program, proposal, idea)
DI002367 Bar: calculated dates by code
Bar for the visualization of the interval between the calculated dates (Calc. start and Calc. end) of the project (program, proposal, idea). The symbol of the bar is determined by the code (of the program, proposal, idea).
DI023412 Bar: float
Bar for the visualization of the date float (positive interval between Requested end and Calc. end) of the project (program, proposal, idea).
DI023373 Bar: delay
Bar for the visualization of the delay (positive interval between Requested end and Calc. end) of the project (program, proposal, idea).
DI002555 Main project name
Name of the main project
DI002771 Created by: Name
When a record is created, the ID (code) of the logged-on user is automatically entered in this field. The creating user is also the owner of a record.
DI003382 Main project customer
Customer of the main project
DI005443 Plan 1 frozen on
Freezing date planning 1
Note
- This field can be unlocked by PLANTA for manual editing. If you want PLANTA to do this, please contact the PLANTA team.
DI005444 Plan 2 frozen on
Freezing date planning 2
Note
- This field can be unlocked by PLANTA for manual editing. If you want PLANTA to do this, please contact the PLANTA team.
DI005445 Plan 3 frozen on
Freezing date planning 3
Note
- This field can be unlocked by PLANTA for manual editing. If you want PLANTA to do this, please contact the PLANTA team.
DI006445 Planning type ID
Code (ID) of the Planning type parameter. For description, see Planning type name.
DI056876 Planning type
Name of the planning type of a project. The planning type serves to define how the projects are calculated. In input mode, a listbox for selection of a planning type is displayed on the respective field.
Values
- 0 = Adherence to schedule
- Availability of capacity or tasks which have already been loaded are not taken into account when loading tasks. No capacity adjustment takes place.
- 1 = Adherence to total float
- In case of capacity shortage, a task can be moved within its total buffer time. If enough available capacity is found, loading is carried out. If not, loading will be carried out at its latest dates (Latest start / Latest end). The project end date (Requested end or Latest end) is not overrun due to capacity shortage.
- 2 = Adherence to capacity
- A capacity shortage will cause tasks to be moved to a point at which sufficient free capacity is available. The project end date (Requested end) is not taken into account, provided that all other requirements are met:
- the Fixing parameter on the task is deactivated
- the resources are planned with the load profile CAP.
- the Adjustment by effort parameter is activated for the resource.
- etc.
- A capacity shortage will cause tasks to be moved to a point at which sufficient free capacity is available. The project end date (Requested end) is not taken into account, provided that all other requirements are met:
Note on structures projects
- Each new subproject in a project structure automatically inherits the planning type (upon creation) from its immediate parent project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Attributes/parameters area
- Proposal Core Data in the Attributes/parameters area
- Schedule (Project/Proposal)
- Outline Plan
- Edit Planning Objects
DI006926 Effort budget
Budget specifications for project effort
Details
- It is a virtual field. The values are fetched from the Effort budget of DT281 via Python value range.
- The Effort budget in DT281 is always a calculated value and represents the number of all effort budgets of the current project and of all of its subprojects. Hence, the value of DI006926 is always the value of the entire project structure if it exists.
- The effort budget in the Budget module is planned/allocated in the Effort budget (without subprojects) field at project level or in the Effort budget (without subprojects) field at yearly tranche level.
DI006927 Deviation effort: total - budget
Absolute deviation of total effort from effort budget in the current planning.
Details
- Deviation > 0 means: Budget overrun!
Calculation via value range
DI006928 % deviation effort: total - budget
Percentage deviation of total effort from effort budget in of the current planning.
Details
- Deviation > 0 means: Budget overrun!
Calculation via value range
- (Total effort - Effort budget ) / Effort budget x 100
DI007786 Cost center ID
Code (ID) of the cost center of the planning object. For description, see DI041497
DI007802 Cost center name
Name of the posting type of the planning object. For description, see DI041497
DI041497 Cost center
Name of the cost center of a planning object. In PLANTA project, the Access to planning objects is controlled via the cost centers and their structure codes. In input mode, a listbox for selection of a cost center is displayed on the respective field.
Note on structures projects
- Each new subproject in a project structure automatically inherits the cost center (upon creation) from its immediate parent project.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Basic data area
- Proposal Core Data in the Basic data area
- Idea Core Data in the Basic data area
- Program Core Data in the Basic data area
- Edit Planning Objects
Details
- You can create and edit cost centers in the Cost Centers module.
DI008837 Cost center structure code
Structure code of the cost center
Details
- Arbitrary order criterion.
- In PLANTA project it is used to define access rights to projects and for selection and sorting purposes.
DI007806 Cost budget overrun
Grouping field with display of the budget overrun category (up to 5%, over 5%). In this field, individual projects (proposals, ideas, programs) are listed, the budget overrun values of which correspond to the value specified in the grouping field.
DI063724 Effort budget overrun
Grouping field with display of the budget overrun category (up to 5%, over 5%). In this field, individual projects (proposals, ideas, programs) are listed, the budget overrun values of which correspond to the value specified in the grouping field.
DI007807 End delay
Grouping field for the display of the delay category (up to 5d, over 5d) In this field, individual projects (proposals, ideas, programs) are listed, the delay values of which correspond to the value specified in the grouping field.
DI007808 Number of projects
In this field, the number of projects is displayed
DI007983 Milestone delay
Grouping field for the display of the delay category for master milestones (up to 5d, over 5d). In this field, individual projects (proposals, ideas, programs) are listed, the delay values of which correspond to the value specified in the grouping field.
DI002833 Split
Via the Split parameter, entire projects can be interrupted (split).
Values
- The project is to be split. In scheduling, all tasks of this project are treated like split tasks.
- The project is not to be split. However, task splitting can also be used individually on the tasks.
Notes
- The activated split overwrites the non-activated task splitting. The opposite is not true, i.e. the deactivated project split does not overwrite the activated task splitting.
- Using the combination of project requested start (if this date is later than the project actual start) at main project level and project split at subproject level you can shift (split) the entire project structure very easily and quickly.
- The project split is to be preset individually for subprojects.
DI010246 Overhead costs
DI023213 Current risk value
Calculated risk value of the planning object in percent. The value is continuously calculated and displayed/refreshed while the risk queries are answered.
Details
- In the Risk Checklist master data module, an own weighting value is stored for Yes or No answers for each risk query.
- In the Project Core Data / Program Core Data / Proposal Core Data user modules, risk queries are answered with Yes or No.
- The risk value is then calculated on the basis of the weighting values of the Yes/No answers of the respective queries according to the following formula:
- Sum of all risk values [(Yes weighting or No weighting) / ( Yes weighting value + No weighting value * 100
Caution: the weighting value is the value which is stored in the master data module for Yes and No answers. The weighting is the weighting value * the respective answer, i.e. Yes or No (1 or 0).
Example
- In the master data module, there are two criteria with the following weighting values:
- 1) Yes=15 No=0
- 2) Yes=10 No=0
- In the user module, the first question is answered with "Yes" and the second with "No".
- The answer to question 1 results in a weighting of 15 = 15*1 + 0*0
- The answer to question 2 results in a weighting of 0 = 10*1 +0*1
- The entire risk value is calculated as follows: (15 / (15 + 10)) * 100 = 60 %
- In the same use case, both questions are answered with “No”.
- The answer to question 1 results in a weighting of 0 = 15*0 + 0*1
- The answer to question 2 results in a weighting of 0 = 10*0 + 0*1
- The risk value is calculated as follows: (0 / (15 + 10)) * 100 = 0 % (no risk)
- If you, e.g., increase the Yes value for question 1 in the master data module to 20, and if the questions are answered as in the first use case (Yes, No), the risk value is increased respectively and then amounts to 66%.
DI022774 Fixed risk value
Calculated risk value of the planning object in percent. In contrast to Current risk value, this value is only displayed or refreshed after the Complete evaluation button in the project core data module of the respective planning object has been clicked on (as a result, the value from Current risk value is copied).
DI022780 Current objective contribution
Calculated objective contribution value of the planning object in percent. The value is continuously calculated and displayed/refreshed while the criterion contribution is specified.
Details
- In the Objective Evaluation Criteria master data module, one weighting value is allocated for each criterion.
- In the Project Core Data / Program Core Data / Proposal Core Data user modules, the criterion contribution is allocated as a percentage value.
- The objective contribution is then calculated from the criterion contribution values and their weighting values according to the following formula:
- Sum (weighting * criterion contribution) of all criteria / sum of all weightings * 100
Example
- There are the following criteria with the following weighting and criterion contributions:
- K1: weighting 3, criterion contribution 25%
- K2: weighting 5, criterion contribution 0%
- K3: weighting 0, criterion contribution 50%
- K4: weighting 5, criterion contribution 100%
- The risk value is calculated as follows: (3*0,25+5*0+0*50+5*1 / 3+5+0+5) * 100= 46,15%
DI022781 Fixed objective contribution
Calculated objective contribution value of the planning object in percent. In contrast to Current objective contribution, this value is only displayed or refreshed after the Complete evaluation button in the core data module of the respective planning object has been clicked on (as a result, the value from Current objective contribution is copied).
DI023121 Objectives
Here you can define the objectives pursued with the planning object.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Descriptive data area
- Proposal Core Data in the Descriptive data area
- Idea Core Data in the Descriptive data area
- Program Core Data in the Descriptive data area
DI023122 Scope and limit
In this field you can describe what is to be done in the planning object and what not.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Descriptive data area
- Proposal Core Data in the Descriptive data area
- Idea Core Data in the Descriptive data area
- Program Core Data in the Descriptive data area
DI023123 Conseq. of non-realization
In this field you can describe the consequences of non-realization.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Descriptive data area
- Proposal Core Data in the Descriptive data area
- Idea Core Data in the Descriptive data area
- Program Core Data in the Descriptive data area
DI023124 Areas involved
In this text field, specialist departments and persons which are involved in the planning object are specified.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Descriptive data area
- Proposal Core Data in the Descriptive data area
- Idea Core Data in the Descriptive data area
- Program Core Data in the Descriptive data area
DI023125 Mandatory
Parameter which serves to mark a planning object as a mandatory planning object.
Notes
- The parameter is meant to be a selection aid for the portfolio manager in the creation of the portfolio. Mandatory projects must be realized, even if other projects seem more profitable. E.g. projects to meet regulatory requirements.
- The parameter has no technical impact on the system.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI023126 Mandatory: reason
Text entry for justifying why the planning object is marked as a mandatory planning object by activation of the Mandatory checkbox.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI023128 ROI
Return on investment (ROI)
Details
- The return on investment is a measure of what is expected to be "returned" from the investment. It thus reflects the profit objective.
- The profit is related to the operating resources invested, because management must achieve the profit with this investment – with the available means.
- As a key figure, the ROI can be broken down into two basic components:
- ROI = Sales return * Capital turnover
- Sales return = Profit/Net revenue
- Capital turnover = Net revenue/Total capital
- ROI = Sales return * Capital turnover
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI023129 Description
Description of the project (idea, proposal, program, request)
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Descriptive data area
- Proposal Core Data in the Descriptive data area
- Program Core Data in the Descriptive data area
DI023130 Internal interest
Internal interest. The value is used to calculate the NPV value.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI023188 Type name
Name of the planning object type. Via the Type parameter, planning objects are distinguished as projects, ideas, proposals, programs, etc. The planning object type is determined by the Type parameter.
Notes for customizers
- DI023188 is used as grouping field.
DI023252 Type name
Name of the planning object type. Via the Type parameter, planning objects are distinguished as projects, ideas, proposals, programs, etc. The planning object type is determined by the Type parameter.
Notes for customizers
- DI023252 is used as grouping field.
DI063005 OLE dev.: project/MMS end dates: calc. end - requested end
Symbol (traffic light) for the visualization of the deviation of the project/program end dates (Calc. end from Requested end) and master milestone end dates (Calc. end from Requested end) in the current planning
Note
- The traffic light refers to the highest of all deviation values.
DI023387 OLE deviation: project end dates: calc. end - requested end
Symbol (traffic light) for the visualization of the project end dates (Calc. end from Requested end) in the current planning
DI023388 OLE deviation MMS end dates: calc. end - requested. end
Symbol (traffic light) for the visualization of the master milestone end dates (Calc. end from Requested end) in the current planning
Note
- The traffic light refers to the highest of all deviation values.
DI023389 OLE deviation costs: total - budget
Symbol (traffic light) for the visualization of the cost deviation (Total costs from Cost budget) in the current planning.
DI023390 OLE deviation effort: total - budget
Symbol (traffic light) for the visualization of the effort deviation (Total effort from Effort budget) in the current planning.
DI023413 Deviation project end dates: calc. end - requested end
Absolute deviation of the project end dates (Calc. end from Requested end) in the current planning
DI023416 Deviation MMS end dates: calc. end - requested. end
Absolute deviation of the master milestone end dates (Calc. end from Requested end) in the current planning
Note
- The highest deviation value from all master milestones is visualized.
DI023655 Project name
Name of the project
DI028199 Display to manager
Currently without function
DI028338 Planned revenues
Planned revenues of the project. The value is determined during scheduling.
Calculation
- Planned revenues of the project = sum of the planned revenue values of all revenue resources planned in the project Revenue values of the individual resources are stored in DT472, however, they are not stored in columns specifically designed for revenues but in the cost columns. In the case of planned revenues, they are stored in the Remaining costs column. Whether the value stored in this column is a cost or revenue value is determined by the type of resource to which the value applies.
Layout objects
- In PLANTA standard, planned revenues of a project are not contained in any module but can be included in the Schedule module via customizing if necessary.
- The other annual revenue values (remaining, actual, total) of a project can be consulted as a sum in the Budget module.
Note
- Planned revenues of a project are only displayed if at least one revenue resource is planned in the project (Schedule).
DI028339 Actual revenues
Actual revenues of the project. The value is determined during scheduling.
Calculation
- Actual revenues of the project = sum of the actual revenue values of all revenue resources planned in the project
Display in modules
- The parameter (DT461) described here is not contained in any module by default but it can be included, e.g., in the Schedule module via customizing.
- However, actual revenue values of a project are additionally saved in further parameters (DT861) and can, e.g., be displayed in the Budget module in the Actual revenues (w/o subprojects) and Actual revenues fields in the sum line of the Benefits and revenues area.
DI028340 Remaining revenues
Remaining revenues of the project. The value is determined during scheduling.
Calculation
- Remaining revenues of the project = sum of the remaining revenue values of all revenue resources planned in the project. Remaining revenue values of the individual revenue resources are stored in DT472, however, they are not stored in columns specifically designed for revenues but in the cost columns. In the case of actual revenues, they are stored in the Remaining costs column. Whether the value stored in this column is a cost or revenue value is determined by the type of resource to which the value applies.
Layout objects
- The parameter (DT461) described here is not contained in any module by default but it can be adopted in the Schedule module via customizing.
- However, remaining revenue values of a project are additionally stored in other parameters (DT861) and can, e.g. be displayed in the Budget module in the Remaining revenues (w/o.SP) and Remaining revenues fields in the sum line of the Benefits and revenues area .
DI028341 Total revenues
Total revenues of the project. The value is automatically calculated as a sum of actual and remaining values (manual input not possible).
Calculation
- Total revenues = Remaining revenues + Actual revenues
Notes
- See also details under Remaining revenues and Actual revenues
DI028352 Internal gross profit
DI006516 Estimate date entire project
Date of the estimate of the entire project by the project manager. The date is updated automatically after the estimate of at least one factor in the Status module has been made/changed.
DI006515 Entire project estimate
Numeric estimate value for the entire project, according to which the display of the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI028844 Cost estimate
Numeric estimate value for costs, according to which the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI028845 Effort estimate
Numeric estimate value for effort, according to which the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI028846 Project / master milestone dates estimate
Numeric estimate value for project and master milestone end dates, according to which the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI028847 Quality estimate
Numeric estimate value for project quality, according to which the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI061342 Risks/opportunities estimate
Numeric estimate value for risks and opportunities, according to which the respective estimate symbol is displayed. The value is usually hidden in the user modules.
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
Note
- The change of the estimate and hence of this value is effected by clicking on the arrow symbol ».
DI023380 OLE entire project estimate
Symbol which visualizes the estimate of the entire project/program by the project/program manager
Notes
- You can change the estimate and hence the symbol shape by clicking on the arrow symbol ».
- In PLANTA standard, changing is only possible in the Status (projects) and Status (programs) modules. In other modules it is an output value.
DI029112 OLE cost estimate
Symbol which visualizes the estimate of the project/program costs by the project/program manager
See notes under OLE Entire project estimate
DI029113 OLE effort estimate
Symbol which visualizes the estimate of the project/program effort by the project/program manager
See notes under OLE Entire project estimate
DI029115 OLE project/master milestone end dates estimate
Symbol which visualizes the estimate of the project/program and master milestone end dates by the project/program manager
See notes under OLE Entire project estimate
DI029116 OLE estimate: quality
Symbol which visualizes the estimate of the project/program quality by the project/program manager
See notes under OLE Entire project estimate
DI061345 OLE estimate: risks/opportunities
Symbol which visualizes the estimate of the risks and opportunities of the project/program by the project/program manager
For notes, see OLE Entire project estimate
DI029133 461: OLAP 1 - 029129
DI029160 461: OLAP 1 - txt
It is used for the visualization of the dynamic grouping values in modules with grouping options, e.g. Projects or Projects: 2 Groupings.
DI029161 461: OLAP 2 - txt
It is used to display the values of the 2nd dynamic grouping in modules, in which 2 groupings are used, e.g. Projects: 2 Groupings
DI029190 Comment: entire project
Comment on the entire project/program
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI029192 Comment: costs
Comment on the costs of the project/program
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI029193 Comment: effort
Comment on the effort of the project/program
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI029194 Comment: project/MMS end dates
Comment on the end dates of the project/program and of the master milestones
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI029195 Comment: quality
Comment on the quality of the project/program
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI061344 Comment: risks/opportunities
Comment on the risks/opportunities of the project/program
The parameter can be edited in the following modules by users with modification rights:
- Project Status in the Current status area
- Program Status in the Current status area
DI029872 % deviation costs: total - budget (baseline)
Deviation in percent of the total costs from the cost budget from the baseline report. The value is copied from the % deviation costs: total - budget parameter of the baseline report.
DI029874 OLE trend cost deviation (current vs. baseline)
Symbol for the visualization of the trend of the cost deviation values from the current planning (% deviation costs: total - budget) compared to the values from the baseline report (% deviation costs: total - budget (baseline))
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029875 % deviation effort: total - budget (baseline)
Percentage deviation of the total effort from the effort budget of the baseline report. The value is copied from the % deviation effort: total - budget parameter of the baseline report.
DI029879 OLE trend effort deviation (current vs. baseline)
Symbol for the visualization of the trend of the cost deviation values from the current planning (% deviation effort: total - budget) compared to the values from the baseline report (% deviation effort: total - budget (baseline))
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029876 Dev.: project end dates: calc. end - req. end (baseline)
Deviation of the calculated end date from the requested end date of the project (program) from the active baseline. The value is copied from the Dev.: project end dates: calc. end - req. end of the baseline report.
DI029877 Dev.: MMS end dates: calc. end - req. end (baseline)
Deviation of the calculated end date of the master milestones from the requested end date of the master milestones from the active baseline. The value is copied from the Dev.: MMS end dates: calc. end - req. end of the baseline report.
The highest deviation value from all master milestones is visualized.
DI029878 OLE trend dev.: project end dates (SR vs. active SR) MMS end dates (current vs. baseline)
Symbol for the visualization of the deviation trend of the calculated end date from the requested end dates of the master milestones of the current planning (Dev.: MMS end dates: calc. end - req. end) compared to the deviation value from the baseline report Dev.: MMS end dates: calc. end - req. end (baseline)
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029880 OLE trend dev.: Project end dates (current vs. baseline)
Symbol for the visualization of the deviation trend of the calculated end date from the requested end date of the project (program) of the current planning (Dev.: project end dates: calc. end - requested end) compared to the deviation value from the baseline report Dev.: project end dates: calc. end - req. end (baseline)
DI029885 % deviation effort: total - budget (active SR)
Percentage deviation of the total effort from the effort budget from the active status report. The value is copied from the % deviation effort: total - budget parameter of the active status report.
DI063793 Dev.: project end dates: calc. end - requested end (active SR)
Deviation of the calculated end date from the requested end date of the project (program) from the active status report with text information (delay/float). The value is copied from the Dev.: project end dates: calc. end - requested end parameter of the active status report.
DI029886 Dev.: project end dates: calc. end - requested end (active SR)
Deviation of the calculated end date from the requested end date of the project (program) from the active status report. The value is copied from the Dev.: project end dates: calc. end - requested end parameter of the active status report.
DI063794 Dev.: MMS end dates: calc. end - requested end (active SR)
Deviation of the calculated end date of the master milestones from the requested end date of the master milestones from the active status report with text information (delay/float). The value is copied from the Dev.: MMS end dates: calc. end - Requested end parameter of the active status report.
The highest deviation value from all master milestones is visualized.
DI029887 Dev.: MMS end dates: calc. end - requested end (active SR)
Deviation of the calculated end date of the master milestones from the requested end date of the master milestones from the active status report. The value is copied from the Dev.: MMS end dates: calc. end - Requested end parameter of the active status report.
The highest deviation value from all master milestones is visualized.
DI029888 % deviation costs: total - budget (active SR)
Percentage deviation of the total costs from the cost budget from the active status report. The value is copied from the % deviation costs: total - budget parameter of the active status report.
DI029890 OLE trend effort deviation (current vs. active SR)
Symbol for the visualization of the trend of the deviation of the total effort from the effort budget in the current planning (% deviation effort: total - budget) compared to the deviation value from the active (last released) status report (% deviation effort: total - budget (active SR))
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029891 OLE trend dev.: project end dates (current vs. active SR)
Symbol for the visualization of the deviation trend of the calculated end date from the requested end date of the project (program) of the current planning (Dev.: project end dates: calc. end - requested end) compared to the deviation value from the active (last released) status report (Dev.: project end dates: calc. end - requested end (active SR)).
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029892 OLE trend cost deviation (current vs. active SR)
Symbol for the visualization of the trend of the deviation of the total costs from the cost budget in the current planning (% deviation costs: total - budget) compared to the deviation value from the active (last released) status report (% deviation costs: total - budget (active SR))
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029893 OLE trend dev.: MMS end dates (current vs. active SR)
Symbol for the visualization of the deviation trend of the calculated end date from the requested end dates of the master milestones of the current planning (Dev.: MMS end dates: calc. end - requested end) compared to the deviation value from the active (last released) status report (Dev.: MMS end dates: calc. end - requested end (active SR)).
Meaning
- Arrow up: negative trend
- Arrow down: positive trend
- Arrow right: no change to the values
DI029895 Status reports: collective creation
This parameter serves to define whether the status reports can be created from the control module at the click of a button. This function is primarily intended for creating status reports for several projects at the same time (collective creation).
Values
- - Reports can be created from a control module for the defined period for several projects at once.
- - The status report creation can only be initiated individually for each project from the Status module.
Note
- The parameter can only be activated or deactivated at main project level. If you try to activate the parameter on a subproject, a message indicating that the function is only available for main projects will be displayed.
- The setting on the main project automatically applies to subprojects as well.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Attributes/parameters area
- Proposal Core Data in the Attributes/parameters area
See also: Collective Creation of Status Reports
DI040784 Last automatic status report
The last automatically created status report
DI063009 Program ID
Technical ID of the program. It is generated automatically and, unlike the functional ID, it cannot be changed. It is usually hidden in the modules.
DI063010 Program name
Name of the respective program
DI063026 Program
Functional ID of the program. It is generated automatically (copied from the technical Project ID). Unlike the technical program ID, the functional ID can be changed afterwards (in the Program Core Data module) if necessary.
DI041089 Process status
Status of the process
DI041184 Current status
Current status of the planning object
DI041195 Phase name
Name of the phase
DI041200 Process model
Code (ID) of the process model. For the description, see Process Model Name.
DI041394 UF info
Use frequency of news
DI041395 UF todo items+risk measures
Frequency of use of tasks and risk measures
DI041396 OLE info
The field signalizes with an OLE symbol whether there are current news for the respective planning object. If there are no current news, the OLE symbol is grayed out. Current messages are messages that are not marked as read.
DI041409 Production costs: Objective
In this field, you can define the desired amount of production costs.
The parameter can be edited in the following module by users with modification rights:
DI041410 Production costs: current
In this field you can define the amount of the current production costs.
The parameter can be edited in the following module by users with modification rights:
DI041411 Production costs: Date
In this field you can enter the date to which the current production costs refer.
The parameter can be edited in the following module by users with modification rights:
DI041412 Production costs: Comments
You can write comments on production costs here
The parameter can be edited in the following module by users with modification rights:
DI041614 Process model name
Name of process model by which the selected project (idea, proposal, request) is planned and controlled. In input mode, a listbox for selection of a process model is displayed on the respective field.
Details
- You can create and edit process models in the Process Model Templates module.
- To learn how to work with process models, see here.
DI041621 Changed by: Name
When a record is modified, the ID (code) of the logged-on user is automatically entered in this field.
DI041680 Area
Code (ID) of the Area parameter. For description, see Area name.
DI041681 Break even
In economics, the break-even point is the point at which cost or expenses and revenue are equal: there is no net loss or gain, and one has "broken even".(source: Wikipedia).
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI041682 Gross profit probability
Gross profit probability of the project (idea, proposal, program).
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Evaluation data area
- Proposal Core Data in the Evaluation data area
- Program Core Data in the Evaluation data area
DI041683 NPV (without subprojects)
Net present value (net capital value of the selected project (proposal, idea) without taking its possibly existing subprojects into account). For further information on capital value, see here. The value is automatically calculated, taking different parameters like costs, revenues, internal interest, etc. into account. Formula
- The calculation is carried out in accordance with the standard formula
- C0 Capital value with regard to t=0
- i calculation interest rate (=internal interest, e.g. 5%)
- N review period
- Zt Flow of payments (cash flow) (source: Wikipedia)
- In PLANTA, the flow of payments (cash flow) is calculated on an annual basis: Zt = revenues + benefit - costs
Parameters involved (current planning)
Variable from the NPV calculation | DI041683 NPV (without subprojects) | DI023127 NPV | Find end values | Source values recordable/editable |
---|---|---|---|---|
Revenues | DT861 Total revenues (without subprojects) | DT861 Total revenues | Budget module, Revenues area | Total revenues is the sum of Remaining revenues and Actual revenues.
|
Benefit | DT861 Resulting benefit (without subprojects) | DT861 Resulting benefit | Budget module, Benefit area | Resulting benefit is either determined from Planned benefit or Achieved benefit. Both values are created/edited in the Key performance indicators area in the Project Core Data. |
Costs | DT282 Total costs (without subprojects) | DT282 Total costs | Budget module, Costs area | Total costs is the sum of Actual costs and Remaining costs.
|
i interest rate | DT461 Internal interest | DT461 Internal interest | Project Core Data, Evaluation data area | Project Core Data, Evaluation data area |
N review period | The planned years in the project (yearly tranches from DT861) | The planned years in the project (yearly tranches from DT861) |
DI023127 NPV
Net present value (net capital value of the selected project (program, proposal) and all of its subprojects. For further information on capital value, see here. The value is automatically calculated, taking different parameters like costs, revenues, internal interest, etc. into account.
For the calculation formula and the parameters involved, see NPV (without subprojects)
DI041688 Possible damage
In projects: Possible damage of the selected project and all of its subprojects, if available (sum of the Possible damage (without subprojects) values of the selected project and of all of its subprojects).
In programs, ideas, and proposals: Possible damage of the respective planning object since no structures are possible here (here: Possible damage = Possible damage (without subprojects)).
DI063802 Possible damage (without subprojects)
Possible damage of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Possible damage values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI028280 Probable damage
In projects: Probable damage of the selected project and all of its subprojects, if available (sum of the Probable damage (without subprojects) values of the selected project and of all of its subprojects).
In programs, ideas, and proposals: Probable damage of the respective planning object since no structures are possible here (here: Probable damage = Probable damage (without subprojects)).
DI063801 Probable damage (without subprojects)
Probable damage of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Probable damage values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI028281 Actual damage
In projects: Actual damage of the selected project and all of its subprojects, if available (sum of the Actual damage (without subprojects) values of the selected project and of all of its subprojects).
In programs, ideas, and proposals: Actual damage of the respective planning object since no structures are possible here (here: Actual damage = Actual damage (without subprojects)).
DI063800 Actual damage (without subprojects)
Actual damage of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Actual damage values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI041690 Possible damage (active SR)
In projects: Possible damage of the project and of all of its subprojects from the active (last released) status report.
In programs: Possible damage of the program from the active (last released) status report. The value is copied from the Possible damage of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI041691 Probable damage (active SR)
In projects: Probable damage of the project and of all of its subprojects from the active (last released) status report.
In programs: Economic damage of the program from the active (last released) status report. The value is copied from the Probable damage parameter of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI041699 Actual damage (active SR)
In projects: Actual damage of the project and of all of its subprojects from the active (last released) status report.
In programs: Actual damage of the program from the active (last released) status report. The value is copied from the Actual damage parameter of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI041693 Possible gross profit
In projects: Possible gross profit of the selected project and all of its subprojects, if available (sum of the Possible gross profit (without subprojects) values of the selected project of and all of its subprojects).
In programs, ideas, and proposals: Possible gross profit of the respective planning object since no structures are possible here (here: Possible gross profit = Possible gross profit (without subprojects)).
DI063799 Possible damage (without subprojects)
Possible gross profit of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Possible gross profit values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI029618 Probable gross profit
In projects: Probable gross profit of the selected project and all of its subprojects, if available (sum of the Probable gross profit (without subprojects) values of the selected project and all of its subprojects).
In programs, ideas, and proposals: Probable gross profit of the respective planning object since no structures are possible here (here: Probable gross profit = Probable gross profit (without subprojects)).
DI063798 Probable gross profit (without subprojects)
Probable gross profit of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Probable gross profit values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI029619 Actual gross profit
In projects: Actual gross profit of the selected project and all of its subprojects, if available (sum of the Actual gross profit (without subprojects) values of the selected project and all of its subprojects).
In programs, ideas, and proposals: Actual gross profit of the respective planning object since no structures are possible here (here: Actual gross profit = Actual gross profit (without subprojects))
DI063797 Actual gross profit (without subprojects)
Actual gross profit of the selected project without its possibly existing subprojects (program, proposal, idea).
The value is a sum of Actual gross profit values of the individual risks of the project (program, proposal, idea) for which the Active checkbox is activated in the Risks/Opportunities module.
DI041695 Possible gross profit (active SR)
Possible damage of the project and of all of its subprojects from the active (last released) status report. The value is copied from the Possible gross profit parameter of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI041696 Probable gross profit (active SR)
Probable damage of the project and of all of its subprojects from the active (last released) status report. The value is copied from the Probable gross profit parameter of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI041698 Actual gross profit (active SR)
Actual gross profit of the project and of all of its subprojects from the active (last released) status report. The value is copied from the Actual gross profit parameter of the active status report.
Note
- Here, the sum value from all planning objects assigned to the portfolio is displayed.
DI058033 Status report: Report name
Name of the status report
DI051808 Main project
ID of the main project
DI051885 Calc. Start (selected SR)
Calculated start date of the project from the selected status report. The value is copied from the Calc. start parameter in DT823 Project/report.
DI056393 Deviation total effort: current - selected SR
Deviation of the total effort of the project from the current planning from the total effort from the selected status report.
DI056844 Deviation total costs: current - selected SR
Deviation of the total costs of the project from the current planning from the total costs of the project from the selected status report.
DI056856 Bar: calculated dates (selected SR)
Bar for the calculated dates of the project from the released status report (Calc. start (selected SR) and Calc. end (selected SR)).
DI056875 VR: Posting type name
Posting type name
DI056884 Information
Information on the project
DI041684 Active baseline ID
ID of the active baseline Active, last created baseline, in case there is more than one.
DI041685 Active status report ID
ID of the active status report. An active status report is a last released status report.
DI056903 Text: active status report:
Here, specifications on the active status report are displayed: ID and date of creation
DI056904 Text: active baseline
Here, specifications on the active status baseline are displayed: ID and date of creation
DI057673 Area name
Name of the area which is used for grouping the evaluation criteria of a planning object. In input mode, a listbox for selection of an area is displayed on the respective field.
See also: Objective Evaluation Criteria |
DI057712 Project name
Name of the project. In input mode, a listbox for selection of a project is displayed on the respective field.
DI001021 Earliest start
Earliest start date of the project which is determined during scheduling.
Calculation
- If there is a Requested start but no Actual start for the project, then Earliest start = Requested start of the project.
- If there is a Actual start but no Requested start for the project, then Earliest start = Actual start of the project
- If there is a Requested start and an Actual start for the project, then Earliest start = smallest date from Requested start and Actual start of the project.
- If there is neither Requested start nor Actual start, then Earliest start = Today's date
DI001022 Earliest end
Earliest end date of the project which is determined during scheduling.
Calculation
- Earliest end of all tasks of the project
DI001479 Latest start
Latest start date of the project which is determined during scheduling.
Calculation
- Latest start of all tasks of the project
DI001480 Latest end
Latest end date of the project which is determined during scheduling.
Calculation
- Latest end of all tasks of the project
DI062551 Position
Determines the position of the subproject in the project structure. Is automatically set when moving subprojects within the Subprojects module.
DI061310 Main milestone
Milestone of the planning object. A listbox is implemented on the field which displays all master milestones of the planning object. You can define one of them as main milestone. Master milestones are used as reference point for different calculations and analyses, a.o. for the calculation of time intervals from the main milestone to other master milestones..
Note
- If you select a main milestone, you have to activate the Schedule with gates checkbox so that the time interval (in weeks) from master milestones to the main milestone can be displayed on the gates.
- The master milestone has no interval indication on the gate and also differs from other gates in graphical terms, since on a gate it has a darker border.
- If no master milestone has been defined but the Schedule with gates checkbox is activated, the calculated end date of the project will be used as a reference point for the calculation of the interval. If there is a master milestone on the calculated end date of the project, the respective gate does not contain an interval indication either (however, it is still not a master milestone and accordingly it has no dark border).
- The interval calculation is carried out when the client is started. A client restart therefore becomes necessary if you want to have the intervals updated after you have, e.g., selected a new main milestone or changed an existing one or if the calculated date of the project has changed.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Key dates area
- Proposal Core Data in the Key dates area
- Program Core Data in the Key dates area
DI061292 Main milestone date
Date of the master milestone. It is automatically displayed as soon as you have selected the main milestone for the project from the Main milestone listbox.
DI061314 Schedule with gates
Checkbox which serves to define whether in the schedule master milestones are to be displayed additionally on the horizontal date axis directly below the scale. If the checkbox is activated and the master milestones are displayed as gates below the scale, a time interval to the main milestone is displayed on every gate. If it is not defined the interval to the calculated end of the project will be displayed.
The parameter can be edited in the following modules by users with modification rights:
- Project Core Data in the Key dates area
- Proposal Core Data in the Key dates area
- Program Core Data in the Key dates area
DI059689 % actual costs to total costs
Percentage ratio between Actual costs and Total costs
DI059690 % actual costs to cost budget
Percentage ratio between Actual costs and Cost budget
DI059691 % actual costs to planned costs
Percentage ratio between Actual costs and Planned costs
DI059692 % actual effort to total effort
Percentage ratio between Actual effort and Total effort
DI059693 % actual effort to effort budget
Percentage ratio between Actual effort and Effort budget
DI059694 % actual effort to planned effort
Percentage ratio between Actual effort and Planned effort
DI060763 Arrow down
This DI is used to customize the function for copying the values of one column to another. The DI is, e.g., used in the Budget module and is realized in the form of arrows pointing downwards.
DI061427 Earned value analysis active
Help DI. Is used as a filter DI in data areas that are only to be displayed if the Earned value analysis active model parameter is activated.
DI063717 Number of deviating tasks
Displays the number of tasks which have been changed.
DI060746 Year virt.
Listbox for selecting the years for manual insertion of the yearly tranches
DI063831 Risk green
Parameter which shows the number of risks in the project (program) with a "green" traffic light..
Details
- Which traffic light exhibits the respective risk depends on the values in the Extent of damage and Probability of occurrence parameters.
DI063832 Risk yellow
Parameter which shows the number of risks in the project (program) with a "yellow" traffic light.
For details, see Risk green
DI063833 Risk red
Parameter which shows the number of risks in the project (program) with a "red" traffic light.
For details, see Risk green
DI063217 Decisions
Text field for entering comments
DI063216 Measures
Text field for entering comments
DI063109 Bar: calculated dates (dotted)
Bar for the visualization of the calculated duration of a project below the scale in milestone overview modules.
DI008759 Comment
Text field for writing a comment
DI063189 Date of last budget calculation
Here, the date on which the budget data was calculated for the last time is stamped.
See also: Calculation Matrix for Dates, Costs, and Budgets
DI063188 Time of last budgeting calculation
Here, the time is at which the budget data was calculated for the last time is stamped.
See also: Calculation Matrix for Dates, Costs, and Budgets
DI063979 Date of last cost calculation
Here, the date on which the costs were calculated for the last time is stamped
See also: Calculation Matrix for Dates, Costs, and Budgets
DI063980 Time of last cost calculation
Here, time at which the costs were calculated for the last time is stamped
See also: Calculation Matrix for Dates, Costs, and Budgets
DI063607 Select
Checkbox for selecting a project for the creation of a controlling status report
The parameter can be edited in the following modules by users with modification rights:
DI064208 Opportunity red
Parameter which shows the number of opportunities in the project (program) with "red" traffic light.
Details
- Which traffic light exhibits the respective opportunity depends on the values in the Gross profit level and Probability of occurrence parameters.
DI064209 Opportunity yellow
Parameter which shows the number of opportunities in the project (program) with "yellow" traffic light.
For details, see Opportunity red
DI064210 Opportunity green
Parameter which shows the number of opportunities in the project (program) with "green" traffic light.
For details, see Opportunity red
064550 Road map: start
In this field, the start date from the last released road map will be displayed if the current project is planned in a road map and the Show road map dates global setting = 1.
Note
- If the project is assigned to several portfolios, the earliest roadmap dates will be displayed.
064551 Road map: end
If the current project is planned in a road map and the Show road map dates global setting = 1, the end date from the last released road map will be displayed in this field.
Note
- If the project is assigned to several portfolios, the earliest roadmap dates will be displayed.
DI064672 Date of last liability import
Is set if all yearly tranches for a project are imported correctly during liability import
DI064673 Time of last liability import
Is set if all yearly tranches for a project were imported correctly during liability import
DI065828 External system
Parameter which defines with which external system the data from PLANTA project is to be exchange. The respective field with a listbox for selection of the external system is only displayed in the Project Core Data module and it is only be displayed once the interfaces to the corresponding systems (PLANTA pulse and/or Jira) have been configured.
Values
- If Jira is configured: Jira
- If pulse is configured: pulse
- If both are configured: Jira; pulse
Note
- A project can only be synchronized with one single system: either with PLANTA pulse or with Jira
Details
- If "Jira" is selected,
- PLANTA project checks
- whether the project is unlocked in PLANTA project. If it is not unlocked, a message will be displayed and the value in the external system field will be reset.
- whether the functional ID of the project complies with the Jira requirements for project IDs. According to these requirements, a project ID must only contain a maximum of 10 characters, it must begin with a letter, and must not contain any special characters. Otherwise, a message will be displayed and the value in the external system field will be reset.
- Jira checks whether the project name already exists. If it does exist, a message will be displayed and the value in the external system field will be reset.
- PLANTA project checks
- If a system has been selected, the respective project is also created in the selected external system. Tasks are synchronization in the Schedule module.
See also: Application under: PLANTA project and PLANTA pulse (PLANTA Hybrid), PLANTA project and Jira, Setting up Interfaces under: PLANTA project and PLANTA pulse (PLANTA Hybrid), PLANTA project and Jira. |
DI065857 Select
Checkbox for the selection of a project, e.g. in the Assign Planning Objects to the Portfolio module
DI066014 Resource requests
Parameter that defines whether and in what form Resource Planning with Requests/Approvals is active in the project. The respective field with a listbox for selection will be displayed in the Edit Planning Objects module.
Values
- inactive: Resource requests/approvals are inactive, i.e. all resources can be planned freely in the schedule. Modules and buttons which belong to resource requests/approvals are not visible.
- active on project level: Project resource requests/approvals are active, i.e. resources with activated Approval required parameter must be approved on project level via the request/approval process.
- active on task level: Task resource requests/approvals are active, i.e. resources with activated Approval required parameter must be approved on task level via the request/approval process.
Notes
- The listbox is only displayed in the Edit Planning Objects module if resource requests are activated on global level (Resource requests active = 1 or 2).
- For new projects, the global setting is used by default. In the Edit Planning Objects module, the setting can be changed per project.
- If the setting is to be changed after requests have already been created, a query will be displayed asking whether the existing requests are to be archived. The setting will only be saved upon confirmation.
- If resource requests are activated in the project after resources have already been planned, no requests will be generated retroactively for these resources.
DI065942 Forecast
Here the number of forecasts on additional effort issued for a project in the course of the recording of hours worked will be displayed. A link is implemented on the number which leads to the Progress module in which you can either view details on forecasts or edit forecasts.
DI066146 Days up to project start/end
In this field, the number of days up to project start or end will be displayed.
Details
- The time up to project start will be displayed for projects the project start (Calc. start) of which lies in the future.
- The time up to project end will be displayed for projects the project start (Calc. start) lies in the past and the project end (Calc. end of which lies in the future.
DI062199 Dependency exists
The active Dependencies checkbox shows that the respective project depends on other projects and/or is required for the completion of other projects.
DI023596 Dominance symbol simulation 461
DI056860 Main project (functional) + Main project name
DI029448 WBS code*
DI066698 Image
Here the image which belongs to the project or proposal is displayed. In the Project Core Data or Proposal Core Data you can change the image in this field.