Skip to main content
Skip table of contents

DT400 Miscellaneous objects

Data table 400 summarizes data items which are used to map special customizing objects, e.g. buttons, linkage routes, etc.

DI066587 Server version

In this field, the server changeset of the currently used server is displayed.

Note

  • The changeset allows you to identify the server version you are using.

DI066588 Client version

Unlike the server field in which the server changeset number is displayed by which the version of the PLANTA project server can be identified, the actual version of the PLANTA project client is specified here.

DI057574 »

Arrow button for switching the values of a parameter. The use (parameter reference) and the name of this button can be different in different modules, e.g. Change note in the Schedule (MOD0099AN) module.

DI059754 Object

Field which can be be used in different modules and for different purposes.

  • In the Documents modules it is used to display the listbox for selection of the document category.

DI002157 DDI for sum areas

Determining data item for sum values

DI004336 Button/IronPython

Data item which is used to customize different module elements which have actions stored on them, e.g. buttons, context menus, etc.

See also: Customize Actions

DI025581 Background

Data item which can be used as a placeholder for different purposes, e.g.

  • to place individual texts, headings, images (OLEs) at desired positions in the module (area headings in the Project Core Data MOD0099JB module)
  • to customize spaces between particular objects (space between budget and cost columns in the Budget (MOD009BOW) module)
  • etc.

DI002070 Link/network linkage

Data item for the visualization of the linkage between objects in the predecessor-successor relationship. It is used in modules with links/network plans, e.g. in the Schedule (MOD0099AN) module.

See also: Linkage by customizing

Scale Data Items

The following data items are used to visualize different scale grids, e.g. day, month, etc., in modules with scales.

  • DI000913 Scale day
  • DI002099 Scale year
  • DI002100 Scale month
  • DI002101 Scale calendar week
  • DI009049 Scale quarter

Projection data items for values from DT468

The following data items are used for projected display of the respective values (available capacity, utilization, planned, etc.) of the resources per period (day) from the current planning (DT468) below the scale, e.g. in modules with utilization diagram, e.g. My Department (MOD009AVE)

  • DI002496 Projection available capacity
  • DI002497 Projection utilization
  • DI002512 Projection planned
  • DI002516 Projection used
  • DI059506 Projection % utilization (468)

Projection data items for values from DT472

The following data items are used for projected display of the respective values (effort/load, overload, costs, revenues) of the load records from the current planning (DT472) below the scale, e.g. in modules in which values are additionally represented below the scale, e.g. in the Time Recording (MOD009ABV) module

  • DI002096 Projection planned load
  • DI002104 Projection actual load
  • DI002105 Projection remaining load
  • DI007128 Projection total-load
  • DI000847 Projection load planned-costs
  • DI000848 Projection load actual-costs
  • DI000849 Projection load remaining-costs
  • DI000850 Projection load total-costs
  • DI040998 Projection total revenues
  • DI059504 Projection overload (472)

See also: Customize Projections, Customize Scale Objects

Projection data items for costs from 827 (without distinction based on resource type costs vs. revenues)

The following data items are used for projected display of the cost values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the  Cost Trend Analysis (MOD0099N1) module. As far as the cost value is concerned, no distinction is made between costs and revenues. Compare the following groups with two projection DIs which represent the cost and revenues values independent of one another.

  • DI034411 Projection planned costs 827
  • DI034412 Projection actual costs 827
  • DI034413 Projection remaining costs 827
  • DI034414 Projection total costs 827

Projection data items for costs from 827 (with distinction based on resource type costs vs. revenues)

The following data items are used respectively for projected display of cost and revenue values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the Costs and Revenues per Month (MOD0099Q6) module.

  • DI029140 827: Projection total costs
  • DI029527 Projection total revenues 827

Projection data items for effort from 827

The following data items are used for projected display of the effort values of the project from the selected status report (which are stored in load report data table 827) below the scale, e.g. in the Cost Trend Analysis (MOD0099N2) module.

  • DI034503 Projection planned effort 827
  • DI034504 Projection actual effort 827
  • DI034505 Projection remaining effort 827
  • DI034506 Projection total effort 827

Projection data items for vacation and absence

The following data items are used for projected display of vacation and absence values below the scale, e.g. in the Absence (009BIC) module

  • DI002541 Projection vacation
  • DI002542 Projection absence
  • DI066004 Projection vacation/absence incl. child resources

Projection actual load

Data item for projected display of the Actual load value from 085

DI002120 Histogram scale (N8)

DI002158 Scale month grid line

DI002539 Scale day vacation planning

DI002160 Scale day GL

DI063250 Pagination: Jump to page

In this field, you can enter to which page you want to jump.

DI063251 Pagination: Records per page

In this field you can specify the number of records to be displayed on a page.

DI007775 OLE icon

The DI is no longer used

JavaScript errors detected

Please note, these errors can depend on your browser setup.

If this problem persists, please contact our support.