DT093 Portfolio SR/project


DI065086 Simulate project

Parameter which serves to (de)activate the planning objects in the simulation (for display in the form of bars below the scale and for consideration in utilization diagrams)

The parameter can be edited in the following module by users with modification rights:


DI065252 OLE overload entire project

Traffic light which shows whether there is an overload (red) for the planning object in the selected simulation period or not (green). Cf.: the OLE overload in project traffic light shows whether the planning object generally has an overload (red) or not (green).


DI064168 OLE manager’s project estimate

Symbol (thumb) for the estimate of the status of the planning object in the portfolio by the portfolio manager at the time of creation of the selected status report


DI064331 Priority

Defines the positioning order of the planning object in the utilization diagram of a simulation (example for low priority: visualization of the planning object further up creates an overload first)


DI064332 Requested start

Requested start date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064333 Requested end

Requested end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064334 Simulation: start

Simulated start date of the planning object. If the planning object has not been simulated yet, the simulated start date is equal to the calculated start date of the planning object from the status report which was used as source for the simulation.


DI064335 Simulation: end

Simulated end date of the planning object. If the planning object has not been simulated yet, the simulated end date is equal to the calculated end date of the planning object from the status report which was used as source for the simulation.


DI064340 Color in simulation

Color of the planning object in the Gantt chart and in the utilization diagram of a simulation/road map


DI064345 Actual values available

Specifies whether there already is actual data in a planning object


DI064346 OLE overload in project

Traffic light which signalizes the existence (red) or nonexistence (green) of overload in the planning object in the period selected for simulation. Cf. the OLE overload in project traffic light which informs you about overload in the entire planning object.


DI064485 Bar: date simulation

Bar for simulated start and end dates of the planning objects. Before the dates have been simulated (changed), they are equal to the calculated dates. As a result, the bar for simulated dates completely overlays the bar for calculated dates.


DI064486 Bar: Actual start - Time recording date

Bar for the visualization of the interval between actual start date and last time recording date of the planning object from the status report which was used as source for the simulation


DI064487 Bar: Calculated dates

Bar for the visualization of the interval between the calculated dates of the planning object from the status report which was used as source for the simulation


DI064488 Bar: Requested dates

Bar for the visualization of the interval between the requested dates of the planning object. The requested dates stem from the status report which was used as source for the simulation.


DI064489 Calc. start

Calculated end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064490 Calc. end

Calculated end date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064502 Actual start

Actual start date (first time recording date) of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064503 Latest time recording date

Latest (last) time recording date of the planning object in the simulation. The date stems from the status report which was used as source for the simulation.


DI064520 Project type name

Name of the planning object type, e. g. project, proposal, etc.


DI064522 Comment by the portfolio manager

Comment of the portfolio manager on the planning object at the time of creation of the portfolio status report

DI062346 OLE project estimate

Symbol (thumb) for the estimate of the status of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062349 OLE date estimate

Symbol (thumb) for the estimate of the dates of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062347 OLE cost estimate

Symbol (thumb) for the estimate of the costs of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062348 OLE effort estimate

Symbol (thumb) for the estimate of the effort of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062351 OLE quality estimate

Symbol (thumb) for the estimate of the quality of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062352 OLE risks/opportunities estimate

Symbol (thumb) for the visualization of the risks and opportunities of the planning object by the planning object manager. The estimate stems from the status report which was assigned to the planning object at the time of creation of the portfolio status report.

DI062207 Project status

ID of the planning object status report which was assigned to the planning object at the time of creation of the selected portfolio status report

DI062338 Project name

Name of the planning object in the respective portfolio status report or in the simulation

DI062987 Report status

Date on which the selected portfolio status report was created or released as a monthly report (the date refers to the date of the most current status)

DI062204 Status report ID

ID of the selected portfolio status report

DI062339 Project estimate

Numeric estimate value for the total status of the portfolio which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062343 Dates estimate

Numeric estimate value for the dates of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062340 Cost estimate

Numeric estimate value for the costs of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062341 Effort estimate

Numeric estimate value for the effort of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062344 Quality estimate

Numeric estimate value for the quality of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062345 Risks/opportunities estimate

Numeric estimate value for the costs of the planning objects assigned to the portfolio and selected for the portfolio status report which is reflected by the corresponding estimate symbol. The value is copied from the DI of the same name in the current planning (DT870

Portfolio

) and is hidden in user modules.

DI062335 Project

ID of the selected planning object in the selected portfolio status report or in the simulation

DI062205 Portfolio ID

ID of the portfolio for which the selected status report was created

DI062622 Top project


DI062336 Project manager

Name of the selected planning object in the selected portfolio status report or in the simulation

DI062337 Project manager ID

Code (ID) of the manager of the selected planning object in the selected portfolio status report or in the simulation

DI062370 Number

Number of the planning objects in the selected group (type)

DI062371 Project type name

Name of the planning object type in the selected group