DT805 Todo item note
From DB version 39.5.0, open items have been renamed todo items. Hence the name of DT805 has changed accordingly. If you use a DB version < 39.5.0, please go to DT805OpenItemNotes.
DI006455 Project ID
Code (ID) of the project to which the
todo item noteis assigned.
Note
- The corresponding data field is hidden by default but the user can unhide it if required.
DI006456 Note
Code (ID) of the note.
Note
- The corresponding data field is hidden by default but the user can unhide it if required.
DI006511 Pos.
Position number of the note is generated automatically. This number can be changed if necessary.
Note
- The corresponding data field is hidden by default but the user can unhide it if required.
DI006512 Note text
In this field the note or checklist item can be entered.
DI006513 Linked file
In this field you can create a link to a file.
Insert file
- Right-click on the Linked file field and select the Insert context menu command.
- Click on the Search button in the Insert hyperlink window.
- Select the required file and click on the Open button.
- Confirm with OK.
- Save.
Details
- It is also possible to directly insert files from, e.g., the Windows explorer or files attached to e-mails via Drag&Drop.
DI027978 Completed
Here you can define whether a checklist item or note is completed or not.
Values
- - Checklist item or note is completed
- - Checklist item or note is not yet completed
Note
- If you activate the checkbox, the value in the % completed field will automatically be set to 100% and the Completed by: name, Completed by, Completed on fields will automatically be filled with the data of the logged-on user.
DI040152 Checklist item
DI040154 % completed
Here you can select from the listbox how many percent of a particular checklist item are completed.
Values
- 0 %
- 25 %
- 50 %
- 75 %
- 100 %
Note
- If you set the value in the % completed field to 100%, the Completed checkbox will automatically be activated and the Completed by: name, Completed by, Completed on fields will automatically be filled with the data of the logged-on user.
DI040155 Completed by
Code (ID) of the resource that completed the checklist item. See also Completed by: name.
Note
- As soon as 100% has been selected in the % completed field or the completed checkbox has been activated, the Completed by: name, Completed by, Completed on fields are automatically filled with the data of the logged-on user.
DI040156 Completed on
Here you can enter or display when the checklist item was completed.
Note
- As soon as 100% has been selected in the % completed field or the completed checkbox has been activated, the Completed by: name, Completed by, Completed on fields are automatically filled with the data of the logged-on user.
DI041600 Completed by: Name
Name of the resource that completed the checklist item
Note
- As soon as 100% has been selected in the % completed field or the completed checkbox has been activated, the Completed by: name, Completed by, Completed on fields are automatically filled with the data of the logged-on user.