DT810 Risk
The risk parameters described below are contained in the following modules:
Risks/Opportunities (Projects, Proposals)
Risks/Opportunities (Programs)
DI007697 Risk
ID of the risk
DI007709 Active
Parameter indicating whether the risk is active.
Values
- The risk actually exists.
Active risks are
taken into account in the calculation of the probable damage of the respective risk and of the entire project.
displayed in the info board.
shown in the status report (with all measures).
- Data is only used for documentation/preparation.
Note
In order to exclude the risk from the calculation of the Probable damage and Probable damage of the project values, this checkbox has to be deactivated.
DI007710 Risk name
Name of the risk
DI007711 Category
Risk category
Values
Date
Costs
Quality
Financial
Business
Strategic
Operational
Reputation
ESG
Note
The risk category values can be completed or changed by a project management administrator in the Listbox Values module.
DI007712 Possible damage
Estimated monetary value of the gross profit that can occur as a result of the risk.
DI007713 Probability
Probability of occurrence of the monetary damage in percent.
DI007714 Linked file
In this field you can create a link to a file.
Insert file
- Right-click on the Linked file field and select the Insert context menu command.
- Click on the Search button in the Insert hyperlink window.
- Select the required file and click on the Open button.
- Confirm with OK.
- Save.
Details
- It is also possible to directly insert files from, e.g., the Windows explorer or files attached to e-mails via Drag&Drop.
DI007715 Probable damage
The value calculated from the possible monetary damage and the probability of its occurrence (possibly reduced by the measures) including costs for pending and completed measures. It is only calculated and displayed for risks with activated Active checkbox.
Calculation
((Probability - Relative risk reduction) * 0.01) * Possible damage) + Relative measure costs
Notes
- If the sum of measure reduction values exceeds the probability of damage specified in the risk, the probability of damage is set to 0% in the calculation of the probable damage, which, however, is not explicitly visible on the surface.
- Even if the probability of damage obtained by the measures can be reduced to 0%, the probable damage does not necessarily have to be 0 since the costs of the measures are included in the calculation.
Examples
| Possible damage | Probability | Relative risk reduction | Relative measure costs | Probable damage | |
|---|---|---|---|---|---|
| Case 1: | 10000 | 50 % | - | - | 5000 |
| Case 2: | 10000 | 50 % | 20 % | 1000 | 4000 |
| Case 3: | 10000 | 50 % | 20 % 40 % | 1000 1000 | 2000 |
DI028260 Actual damage
Actual monetary value of the damage caused by the occurrence of the risk.
DI026062 Description
Text field for the description of the risk. Unlike the name parameter, this parameter allows for a longer text entry.
DI028258 Incurred on
Date on which the damage occurred.
DI028259 Completed on
Date on which the risk is considered to be settled.
DI063143 Priority
Parameters for determining the priority of the risk. The evaluation is based on three categories: low, medium, high.
DI063820 Extent of damage
Parameters for assessing the qualitative damage without risk treatment. The evaluation is done by three categories:
harmless
minimal
noticeable
important
serious
critical
The values of the parameter are used together with the values of the Probability of occurrence parameter for graphical analysis in the matrix diagram without risk treatment.
DI063823 Probability of occurrence
Parameters for assessing the probability of qualitative damage without risk treatment. The evaluation is done by three categories:
improbable
very rare
rare
possible
probable
very probable
The values of the parameter are used together with the values of the Damage extent parameter for graphical analysis in the matrix diagram without risk treatment.
DI063819 Extent of damage name
Name of the extent of damage value. For description, see Damage extent.
DI063821 Probability of occurrence name
Name of the probability of occurrence value. For description, see Probability of occurrence.
DI067036 Weak point
Text field for describing the weak point as part of the qualitative risk evaluation.
DI067037 Threat
Text field for describing the threat as part of the qualitative risk evaluation.
DI067039 Assessment without risk treatment
Parameter that shows the risk assessment that is automatically calculated from the damage extent and its probability of occurrence without risk treatment. The evaluation is visualized by a traffic light stored on the field.
DI067043 Risk treatment
Text field for describing risk treatment as part of the qualitative risk evaluation.
DI067050 Assessment with risk treatment
Parameter that shows the risk evaluation which is automatically calculated from the damage extent and its probability of occurrence with risk treatment. The evaluation is visualized by a traffic light stored on the field.
DI067054 Acceptance
Parameter that defines whether the person responsible accepts the risk or has assumed overall responsibility for it.
DI067059 Probability of occurrence with risk treatment
Parameters for assessing the probability of qualitative damage with risk treatment. The evaluation is done by three categories:
improbable
very rare
rare
possible
probable
very probable
The values of the parameter are used together with the values of the Damage etent with risk treatment parameter for graphical analysis in the matrix diagram with risk treatment.
DI067061 Damage extent with risk treatment
Parameters for assessing the qualitative damage with risk treatment. The evaluation is done by three categories:
harmless
minimal
noticeable
important
serious
critical
The values of this parameter are used together with the values of the Probability of occurrence with risk treatment parameter for graphical analysis in the matrix diagram with risk treatment.
DI067123 Responsible: Name
Name of a resource who has been assigned to a risk as its Person responsible.
DI067124 Responsible
Resource that is assigned as person responsible for the entire risk. This resource monitors the individual measures and coordinates cooperation with those responsible for the individual measures.
DI063254 Project
ID of the project in which the risk was recorded
DI067190 Project name
Name of the project