Edit Gantt Chart
Information
- In PLANTA project, schedules cannot only be edited in tabular view by entering the corresponding fields but also in graphical view (in the Gantt chart). The required functions can be adjusted via customizing.
- In PLANTA Standard the editing of Gantt charts within the Schedule module is possible. By default, the following editing options are available:
- Link date bars (create links graphically), change and delete links
- Change requested date bars (requested dates) graphically.
Create and Edit Links Graphically
Info
- Links represent dependencies between tasks.
Create Link
Procedure
- Move the mouse pointer to the bar from which a link is to be created (source bar). Instead of the mouse pointer, a cross will be displayed.
- Place the cross at the beginning or at the end of the source bar depending on which link type you wish to create (e.g. for the Finish-Start relationship, place the cross at the end of the source bar).
- Click and hold the left mouse button and drag the mouse to the beginning or to the end of the target bar depending on what link type you wish to create (e.g. for a Finish-Start relationship drag the mouse to the start of the target bar). As a result, a connection line between the two bars will be displayed.
- As soon as the destination bar is reached, the start position in the source bar and the destination position in the destination bar are marked by yellow arrows.
- Release the left mouse button. The new link will be created and will be visualized as a connection line.
Note
- You can only delete links graphically in particular module variants of the Schedule module (e.g. the base variant).
- If you try to create a link in module variants in which graphical creating is not allowed, the following message appears: Cannot carry out creation.
Change Link Type
Procedure
- Click on the required link line in the Gantt chart to have it highlighted.
- Then right-click and select the required link type with the link type → SS/FF/SF/FS context menu command;
Note
- You can only delete links graphically in particular module variants of the Schedule module (e.g. the base variant).
Delete Link
Procedure
- Click on the required link line in the Gantt chart to have it highlighted.
- Then right-click and select the Delete link context menu command.
Note
- You can only delete links graphically in particular module variants of the Schedule module (e.g. the Base variant).
- If you try to delete a link in module variants in which graphical deletion is not allowed, the following message is displayed: Deletion not permitted in this area.
Change Requested Date Graphically
Information
- When moving requested dates, you have the option to
- move only one of the requested dates and therefore change the length of the bar
- move both dates at once, i.e. the entire bar without changing its length
Move one of the requested dates (length of the bar changes)
- Hover the mouse over the margin of the requested start or requested end symbol.
- Once the mouse pointer becomes an arrow pointing in both directions, left-click and drag the displayed preview bar in the required direction and release the mouse button at the required position.
- The bar length visualizing the task duration (a time period between Requested start and Requested end) will then be extended or shortened.
Move both requested dates (length of the bar remains the same)
- Mouse-over on the requested start or the requested end symbol.
- Once the mouse pointer becomes a hand, left-click on the required symbol and drag the displayed preview bar in the required direction and release the mouse-button at the required position.
- As a result, the entire bar is moved into the required direction, and the length of the bar remains the same.
In both cases,
- a dotted line will appear, visualizing the time interval between the Requested start and Requested end (bar length) and
- a tooltip will be displayed, showing Requested start, Requested end and task duration figures between these tasks. Which parameters are displayed in the tooltip can be defined by customizing.
- The task duration displayed in the tooltip corresponds to the bar length minus weekends and holidays.
- The task duration can be equal to or deviate from the bar length, depending on how many weekends or holidays there are in the respective time period. As a result, the following behavior can occur:
- although a date is shifted, the duration remains the same.
- although the bar length remains the same, the duration changes.
- The task duration can be equal to or deviate from the bar length, depending on how many weekends or holidays there are in the respective time period. As a result, the following behavior can occur:
- The task duration displayed in the tooltip corresponds to the bar length minus weekends and holidays.
- Videos on How to Use PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio
- Videos on How to Use PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio
- Videos on How to Use PLANTA project/portfolio
- Videos on How to Use PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio
- Videos on How to Use PLANTA project/portfolio
- Videos on How to Use PLANTA project/portfolio
- Videos zur Anwendung von PLANTA project/portfolio