Introduction/Program Operation
Version 27 Version 26 39.5.25 39.5.23 39.5.22 39.5.21 39.5.20 39.5.19 39.5.18 39.5.17 German English
Version 27 Version 26 39.5.25 39.5.23 39.5.22 39.5.21 39.5.20 39.5.19 39.5.18 39.5.17 German English

Tutorial: PLANTA Software Operation

Objective of this tutorial

  • This tutorial introduces the PLANTA user interface and its operating functions. After this tutorial you can

    • record data in modules, copy it via drag & drop, save, and delete it,

    • search and filter data in a module (with filter criteria and fulfillment rules) and unhide and hide child data,

    • adjust the display of a module: switch the module view, sort, unhide and hide, move, and resize columns.

Please note:

  • This tutorial is especially designed for users with management roles. For project team members we recommend the short version of this tutorial.

  • All exercises are based on the PLANTA demo data. This data must be installed beforehand.

The screenshots used in this tutorial are mere examples of functions and may differ from the actual layout in the program.

Starting and Exiting the Program

Start and login

  • Enter the URL of the PLANTA software in the address bar of the browser and confirm.

    • After the PLANTA software has been called up in the browser, the login screen appears.

  • If demo data is installed, an overview of the PLANTA standard roles appears first.

    • Switch to the standard login screen via the Zum Login button (top right).

    • Click the field with the Multiprojektmanager role.

LoginEN.png

Exit

  • In the lower area of the user menu, click the button with the user name and then Log Out.

  • Alternatively: In the header of the user menu, click the PLANTA logo and then select the Data → Exit Program menu item.

    • If there are any unsaved changes, the following message will be displayed: Save? Some data has been changed. After the message has been confirmed, the program is closed.

    • If all changes have already been saved, the program will be closed (without further prompt).

PLANTA Project User Interface

Did you know?

Click here to watch a video explaining the PLANTA Project user interface.

Information

  • User menu

    • Positioned on the left of the screen by default and consists of the following elements:

      • Header with the PLANTA logo (opens a drop-down menu with all menu items), search icon, and plus button for creating new planning objects and portfolios

      • Quick access area with links to Home, My Objects, and favorites

      • Primary navigation with the application and/or customizing modules

      • Secondary navigation, which is opened via the Settings link, contains administrative modules and is only visible to authorized users.

      • User profile at the bottom with the avatar and name of the logged-on user; a click opens a drop-down with User Settings and Log Out

  • Module panel

    • Located on the right of the screen and contains:

      • Breadcrumb navigation at the top left and further menu items

      • Title bar with relevant data on the respective planning object

      • Module tabs

      • Action bar with buttons for the actions relevant in the respective module context (e.g. Save, Delete)

      • Active module (content)

        • In PLANTA, a module (also called view) is a unit that enables the display and editing of data from the database (e.g. project data).

  • Status bar

    • The status bar is located at the bottom left of the screen. It displays messages on the progress of the program that do not need to be confirmed.

      • Depending on the configuration, status messages can be displayed instead or additionally at the bottom of the screen and as a status chip in the action bar.

See also: Detailed Description of the PLANTA User Interface

Modules

Information

  • A module enables data from the database to be displayed and edited.

  • The data is arranged in records which again consist of individual data fields.

  • A record summarizes attributes/parameters of an object (project, task, resource, etc.) with their corresponding values.

  • Values are displayed in separate data fields.

    • What data fields belong to a record (record structure) is defined by the customizing of the corresponding data area.

  • The same data field across several records forms a column.

Example

DatensatzMarkEN.png
  • Here, four records are displayed: one project record (marked red) and three task records (marked yellow).

    • The project record consists of two data fields (Project and Project name), and their corresponding values.

    • The task records consist of six fields (Task, Task name, Remain., Calculated end, favorites star, and Completed) and their corresponding values.

  • All Calculated end fields form a column (marked green). The data logical Calculated end column equates to the layout column.

See also: Further Details on the Module Structure

Graphical Representation of Data

Information

  • In some modules, particular data is represented graphically:

    • in the form of histograms, e.g. utilization diagram for the representation of resource utilization throughout a particular period,

    • in the form of bars, e.g. for the visualization of project or task dates.

DiagrammeEN.png

Module Views

Information

  • Almost every module in PLANTA Project can be modified on the user interface to meet individual requirements of the user and saved as an alternative view.

    • For instance, it is possible to only have the fields that are most frequently used displayed in a module while all other fields are hidden.

      • To create a custom module view, click the View button on the right of the action bar.

  • For some modules, PLANTA already provides default module views.

    • If alternative module views are stored for a module, they are called up via the button for changing the module view in the action bar. By default, this button shows the Base view.

Task

  • Select the Inactive Projects module view in the Gantt module.

Procedure

  • If the Gantt module of the Projects panel is not open yet, select Planning → Projects in the user menu.

    • The panel opens. The Gantt module is focused automatically.

  • Click the button for selecting other module views in the action bar.

    • Select the Inactive Projects module view from the listbox.

ModulvariantenEN.png
  • The module view is loaded. The Gantt module now only displays the inactive projects.

ModulvarianteOffenEN.png
  • Select the Base entry in the module view listbox to return to the Base view.

Note

  • You can create individual module views and define them as favorites. The module view marked as a favorite is loaded when the module is opened.

See also: Details on the Creation, Editing, and Deletion of Module Views

Buttons

Information

  • Buttons in the PLANTA system are

    • module buttons for executing different actions or for refreshing data or

    • buttons in dialog or message boxes.

Example of module buttons

Buttons1EN.png

Note

  • On each button there is a tooltip which explains the action on the respective button (in the case of pure symbol buttons) or further clarifies them (if the label is not sufficiently meaningful). For this purpose, see the Tooltips section.

Example of buttons in a dialog box

Buttons2EN.png
  • To activate a button,

    • click on the button displayed on your screen with the cursor or

    • focus the button with the TAB key and press ENTER or SPACE (for module buttons) on the keyboard.

Context Menu

Information

  • The context menu is opened via the WeitereAktionen.png More actions button, which is displayed when the mouse pointer is moved over the record.

    • Alternatively, it can be opened by right-clicking on the record.

  • Depending on the record on which the context menu command was executed, different context menu commands are offered, e.g.:

    • Insert: Insertion of records

    • Individual context menu commands: Start actions (e.g. opening additional modules or macros)

    • (Un)mark: Mark or unmark the record

KontextmenuEN.png

Tooltips

Information

  • Tooltips are texts which are shown when the mouse is moved over particular elements of the user interface.

  • In PLANTA Project there are two types of tooltips:

    • Automatic tooltips are automatically displayed on the headings which are truncated due to insufficient field length. In this case, the tooltip shows the entire heading.

    • Tooltips stored by the customizer. They contain help texts or explanations for the affected field. Such tooltips can be stored on regular fields as well as on buttons and bars.

TooltipEN.png

Create, Edit, Delete Data

Information

  • PLANTA distinguishes between activation and marking of data.

    • Data fields must be activated in order to record and edit data in them or to delete data from them.

    • Records must be marked in order to be copied, moved, deleted, etc. entirely.

Activate/Mark/Unmark

Procedure

  • Activate by clicking or making an input.

    • Only one data field can be activated (not the entire record). It is highlighted in bright blue.

    • The record in which the activated field is located is considered focused. It is highlighted in light blue.

AktivierenEN.png
  • Mark by pressing CTRL + mouse click.

    • The entire record is marked.

    • The marked record is highlighted in bright blue.

MarkierenEN.png
  • Unmark by pressing CTRL + clicking on the marked record.

  • Mark multiple records:

    • Select the first record and press CTRL + mouse click to mark it (e.g. task 3.1).

    • Select the last record and press SHIFT + mouse click to mark it (e.g. task 5.1).

      • This will cause all records between the first and the last record to be marked at the same time.

      • Result:

MarkierenMehrereEN.png
  • The marked records can be unmarked by pressing SHIFT + mouse click on the first record.

  • Mark all records by pressing CTRL + A.

    • Result:

MarkierenAllesEN.png
  • The marked records can be unmarked by pressing CTRL + D.

See also: Details on Activation, Marking, and Unmarking of Records

Edit

Change existing values

  • Which data fields can be edited and how they can be edited in existing records depends, among other things, on the data field type:

Data field type

Description

Example

Input data field (input)

  • Here, input can be made and changed at any time.

  • This field is bright blue when it is activated.

  • E.g. input field for hours worked.

InputEN.png

Output data field (output)

  • Here, no specifications can be made.

  • Fields of this type are dark blue when they are activated.

  • E.g. the display of the required remaining effort of a task in the Time Recording module.

OutputEN.png

Link data field

  • This is a data field the value of which is displayed as a hyperlink.

  • If you click on a link, you are, e.g., redirected to another module.

LinkEN.png

Listbox

  • This is an input field to which a selection list with values is attached, so that you can either make a selection from the given list or make a manual input.

ListboxEN.png

Mandatory data field

  • This is a field marked with an asterisk that must be filled with values.

  • You cannot save if these fields are not filled.

MussEN.png

Checkbox

  • This is a field in which only Yes/No values are permitted in the form of a checked or unchecked checkmark.

CheckboxEN.png

Traffic light

  • This is a field on which a traffic light function (color) is stored.

  • E.g. as a warning notice when using the respective variant of the Time Recording module if the specified hours worked (here: 7 h) exceed the presence (here: 6 h).

AmpelEN.png

Continuous text field

  • This is a field in which you can write longer texts.

FliesstextEN.png

See also: Detailed Description of the Data Field Types

Copying Data via Drag & Drop

Information

  • New values can either be entered manually or copied from other fields. For this purpose, you can use PLANTA's own Drag&Drop copy function, which replaces the conventional copying via CTRL + C and CTRL + V.

    • Field to field (default setting)

    • Field to Column

    • Column to Column

Task

  • Copy values via Drag&Drop in the Schedule module.

Procedure

  • Click on Planning → Projects in the user menu.

    • The Projects panel opens and the Gantt module is focused automatically.

    • Here, click on the link on the ID of project 5000 Fräszentrum FS1.

ID5000EN.png
  • The panel of the project is opened.

  • Click on the Schedule tab to open the module of the same name.

  • Copy: Field to Field

    • Drag the content of the source data field (Remaining duration field of task 1.3) to the target data field (Remaining duration field of task 1.4) via CTRL + holding down the left mouse button.

    • As soon as the cursor is on the target field, it changes its form (see the picture). Release the left mouse button.

KopierenFeldTPEN.png
  • The value of the source field is copied to the target data field.

KopierenFeldErgebnisTPEN.png
  • Copy: Field to Column

    • In the header of the user menu, click the PLANTA logo and define the operation via Edit → Dragdrop copy → Field to column.

    • Mark all target records with CTRL + click on the start record and SHIFT + click on the end record (e.g. task 1.3 as a start record and task 2.2 as an end record).

    • Drag the content of the source data field (Remaining duration field of task 1.1) to the Remaining duration target column of the marked records via CTRL + holding down the left mouse button.

    • As soon as the cursor is on the target column, it changes its form (see the picture). Release the left mouse button.

KopierenFeldSpalteEN.png
  • The value of the source data field is entered for all marked records in all records of the target column.

KopierenFeldSpalteErgebnisEN.png
  • Copy: Column to Column

    • In the header of the user menu, click the PLANTA logo and define the operation via Edit → Dragdrop copy → Column to column.

    • Mark all target records with CTRL + click on the start record and SHIFT + click on the end record (e.g. task 1 as a start record and task 2.2 as an end record).

    • Drag the content of the source column (Calc. start) to the target column (Requested start) via CTRL + holding down the left mouse button.

    • As soon as the cursor is on the target column, it changes its form (see the picture). Release the left mouse button.

KopierenSpalteSpalteEN.png
  • The values of the source column fields are entered in the corresponding data fields of the target column for all marked records.

KopierenSpalteSpalteErgebnisEN.png

See also: Details on the Drag&Drop copy mimic as well as on the copying and structuring of records

Insert New Records

Procedure

  • You can insert a record in the following ways:

    • Press the F4 key or

    • select the required option in the context menu via the plus button, which is displayed when the mouse pointer is positioned over a record, or via the right mouse button, or

    • click on the plus symbol in the action bar or

    • click on the plus symbol in the data area heading line or in the record heading.

Example

EinfgenEN.png
  • Result: A blank record has been inserted.

NeuerDatensatzEN.png
  • Special case 1: Insertion via dynamic plus button in the record

EinfgenKontextmenuEN.png
  • Special case 2: Insertion via static plus button in the record

    • This option is only available in some modules, e.g. in a variant of the Time Recording module.

EinfgenLightEN.png
  • Result:

NeuerDatensatzLightEN.png

See also: Detailed Description of Insert Options

Save

Procedure

  • Save the data

    • by clicking on the Save button in the action bar,

    • by pressing CTRL + S or

    • by using the Edit → Save menu items.

  • If some of the records are still invalid (e.g. blank lines) when you save, the following message is displayed: Mark invalid records?

    • If this message is confirmed with Yes, records whose IDs are not filled are marked. They can be edited if necessary or deleted with the Delete marked button in the action bar.

    • If the message is answered with No, the invalid records are not marked.

Delete

Deletion of values

  • Activate the required data field.

  • Delete the value.

  • Save.

Deletion of entire records

  • Mark the required record.

  • Click on the Delete marked button in the action bar.

  • Afterwards, the following message is displayed: Delete marked data?

  • Confirm it with Yes.

  • Save.

See also: Detailed Description of the Program Operation

Search in Module

Task

  • Search a character string in the Schedule module of project 5000.

Procedure

  • Go to the Schedule module of project 5000 in case it has not yet been opened.

  • Display the search bar at the bottom margin of the screen via:

    • the Search button in the action bar or

    • the Data → Search in module menu item or

    • via the CTRL + F key combination.

  • Enter the character string to be searched in the input field (e.g. "Engineering").

    • The module automatically scrolls to the first character string in the module which matches the search value.

      • The first hit is highlighted in green. All further hits are marked yellow.

SuchenEN.png
  • Navigate:

    • Jump to the next hit (down):

    • Jump to the previous hit (up):

Details

  • The hit selected by jumping now has a green background. All further hits are marked yellow.

  • In the search, hits may also be found in the data which is not displayed. If you jump to these hits, the records which were previously invisible are opened.

SuchenAbwrtsEN.png

See also: Description of Further Search Functions

Filter

Information

  • Filtering enables you to restrict the display of data in a module.

  • You can filter with the help of filter criteria and fulfillment rules.

Details

  • Filter criteria can be set in almost every module.

  • The filter options are dependent on the customizing of the module and on the individual user rights.

  • In the PLANTA standard system, filter criteria and fulfillment are already preset by the customizer in many modules.

Simple Filtering (Filter Criteria Only)

Task

  • Filter the tasks of project 5000 Fräszentrum FS1 by the required calculated start period via filter criteria in the Schedule module.

Procedure

  • Initial situation: Schedule of project 5000 without filter.

TerminplanAnfangEN.png
  • Open the Filter Criteria module via:

    • the Filter button in the action bar or

    • the Extras → Filter Criteria menu item or

    • the CTRL + ALT + F key combination.

  • Expand the Task area.

    • In the Schedule, scroll right in the middle window to the Calc. start column and read the month in which task 1.4 starts.

    • Enter the first and the last day of this month in the Calc. start line in the Filter from and Filter to fields.

FilterkriterienEinfachEN.png
  • Click on the Filter button.

  • Result: In the Schedule source module, only those tasks of the project are displayed the calculated start of which lies within the selected period.

FilterkriterienErgebnisEN.png

Details on the changing of filter criteria

  • When clicking on the Filter button, a data reselection is always carried out, so that only the data which correspond to the last entered filter criteria are displayed.

  • If you want the results of the newly set filter criteria to be displayed in addition to the previous filter results, click on the Filter additively button instead of the Filter button.

Filter via Fulfillment

Information

  • With the Fulfillment option you can determine which data from which child areas is displayed for a parent data area or not.

Operators

  • & = AND

  • | = OR

  • ! = NOT

Task

  • Filter via fulfillment rules to display only those tasks to which no resource is assigned in the Schedule module.

Procedure

  • Open the Filter Criteria module from the Schedule module via the Filter button in the action bar.

  • Expand the Task area.

  • Empty the fields in the Calc. start line.

  • Enter "!19" in the Task line in the Fulfillment rule field.

    • The ! operator means that only records are to be displayed which do not contain particular data (marked by the subsequent number).

    • The number 19 is the Position number of the Resource data area (framed in blue on the image, your own system may show a different number). With this fulfillment rule you can therefore define that only tasks for which no resource assignments exist are displayed.

  • Activate the Fulfillment checkbox to apply the fulfillment rule in the filter process.

ErfllungsregelVGEN.png
  • Click on the Filter button.

  • Result: Only tasks without assigned resources are displayed.

ErfllungErgebnisEN.png

Filtering via Filter Criteria and Fulfillment

Information

  • Filter criteria and fulfillment can also be combined.

Task

  • In the Schedule module, filter to display, with the help of filter criteria and fulfillment rules, only those tasks

    • the calculated start of which lies within a particular period and

    • to which a resource is assigned.

Procedure

  • Open the Filter Criteria module from the Schedule module via the Filter button in the action bar.

  • Expand the Task area.

    • Enter a required period in the Calc. start line in the Filter from and Filter to fields, e.g. the same period as in the Simple Filtering section.

  • Enter "19" in the Task line in the Fulfillment rule field.

    • The entry does not contain any operators (&, |, !), so that only records are displayed which contain particular data (marked by the subsequent number). In this case it is data from the Resource data area, marked by the number 19.

      • With the "19" fulfillment rule you can therefore determine that only tasks for which a resource assignment exists are displayed.

    • Activate the Fulfillment checkbox to apply the fulfillment rule in the filter process.

FKErfllungEN.png
  • Click on the Filter button.

  • Result: Only tasks are displayed the calculated start of which lies within the selected period and to which a resource is assigned.

FKErfllungErgebnisEN.png

See also: Details on Filter Criteria and Fulfillment Rules with Examples

Reset Filter

Procedure

  • To reset the filter and switch back to the default view of the Schedule module, click on the Reset and filter button in the Filter Criteria module.

    • Result: In the Schedule module, all tasks are displayed unfiltered.

TerminplanEndeEN.png

Unhide and Hide Child Data

Initial situation

  • In the Schedule module of project 5000, summary task 1 Engineering is expanded (identifiable by the ButtonAusgeklappt.png arrow symbol), so that its child tasks (1.1 to 1.5) are displayed.

  • The task records 1.1 to 1.5 are collapsed if they have child data (identifiable by the ButtonEingeklappt.png arrow symbol), i.e. their child data is hidden.

BaumstrukturVorherEN.png

Unhide/hide via the tree structure arrow symbol

  • Click on the ButtonEingeklappt.png arrow symbol of record 1.1 to expand it and to have the child data (resources) displayed.

  • The arrow is pointing down ( ButtonAusgeklappt.png ), indicating that the task is expanded.

BaumstrukturNachherEN.png
  • Collapse the task by clicking on the ButtonAusgeklappt.png arrow symbol

Unhide/hide via double click

  • Double-click on an output field (output) of task record 1.1, e.g. the Actual duration field.

  • Now all child areas of the record are shown.

  • Double-click again to hide the child areas again.

Unhide/hide via key combination

  • Activate an arbitrary field of task record 1.1.

  • Use the CTRL + "+" key combination to unhide all child records of record 1.1.

    • Hide the data again via CTRL + "-".

  • Use the CTRL + "*" key combination to have the child data of all records displayed which are on the same level as the focused record (i.e. 1.1, 1.2, ... , 2.1, 2.2, 3.1, etc.).

EinblendenTastenkombiAlleEN.png
  • Hide the data again via CTRL + "/".

Data Field Options

Sorting in Modules

Information

  • In data sorting, a distinction is made between sort direction and sort sequence.

    • With the help of a sort direction you can specify whether the data is to be sorted in ascending or descending order.

      • The sort direction is then visualized in the column heading by triangles that point up or down.

    • With the help of a sort sequence you can specify by which column the sorting of the data of a module is to be performed first, second, etc. if there are several identical values within the columns.

      • The sort order is visualized by numbers in column headings.

Example

  • Open the Projects panel in the user menu via Planning → Projects. The Gantt module is activated automatically.

    • In this module, a sorting is already preset.

    • The sorting is done within the data group, i.e. the A projects, B projects, etc. are sorted independently from one another.

      • The triangles pointing up in the Project and Priority column headings show that both columns are sorted in ascending order.

      • The Priority column has the number 1, i.e. the data is sorted first by this column.

      • The Project column has the number 2, i.e. if in the Priority column there are several records which possess the same entry, the entries in the Project column (hence the project ID) determine the sorting among these records.

        • Since in the present case no priority values occur multiple times within the project group, the data is only sorted by the Priority column. The sorting number on the Project column has no influence.

Sortierung1EN.png

Task

  • Change the sort sequence: In the Gantt module, sort first by the Manager column and define the ascending sort direction.

Procedure

  • Click on the heading of the Manager column. The column is first sorted in descending order (triangle pointing down).

  • Click on the heading again to sort the data in the column in ascending order.

    • The triangle pointing up indicates the ascending sort direction, and the 1 indicates the sort sequence of the Manager column.

    • The Priority and Project columns which previously had the numbers 1 and 2 now automatically receive the numbers 2 and 3.

      • The column which was clicked on last always receives the sort sequence 1, i.e. the numbering of the other columns is changed accordingly.

Sortierung2EN.png
  • The project records are now sorted alphabetically by manager names (sort sequence 1).

  • Since there are four entries in the C projects group for manager Ronja Koch, the respective records (projects 8000, P2-882-1, P2-882-3, and AI) are sorted by their values in the Priority column (sort sequence 2) in ascending order.

  • Since the projects of Ronja Koch have different priority values, the sort sequence 3 has no influence on the Project column.

Sortierung3EN.png

Task

  • Change the sort direction: Change the sort direction of the Manager column from ascending to descending.

Procedure

  • In the heading, the triangle visualizes the current sort direction. The triangle pointing up on the Manager column shows that the column is sorted in ascending order.

  • Change the sort direction of the column by clicking on the heading of the Manager column.

  • Result: The sort direction of the Manager column is changed. The column is now sorted in descending order (cf. sorting above).

Sortierung4EN.png

Change the Column Width (Data Field Width)

Task

  • Reduce the width of the Project name column in the Gantt module.

Procedure

  • Position the mouse on the right separator of the Project name column or next to the column heading.

    • The mouse pointer then changes its shape.

SpaltenbreiteMausEN.png
  • You can now expand or reduce the size of the respective column by dragging the mouse to the right or to the left.

    • In this case drag the mouse to the left in order to reduce the size of the Project name column.

SpaltenbreiteZiehenEN.png
  • Result:

SpaltenbreiteEndeEN.png

Unhide/Hide Columns

Task

  • Hide the Phase column in the Gantt module and unhide the Effort column.

Procedure

  • Right-click on the column heading line.

  • A menu is opened, in which all visible columns or data fields (checked) of the respective window and all hidden columns or data fields (unchecked) of the current module are listed.

  • Deactivate the checkmark next to the Phase entry by clicking on it.

  • Activate the checkmark next to the Effort entry by clicking on it.

AusblendenMenuEN.png
  • Close the menu by left-clicking outside the menu or by right-clicking on the column heading line again.

  • The Phase column is now hidden and the Effort column is displayed.

AusblendenEndeEN.png

Moving Columns

Task

  • Position the Effort column between the Priority and Manager columns in the Gantt module.

Procedure

  • Click on the heading of the Effort column.

  • By left-clicking move the column to the required position and release the mouse button.

VerschiebenEN.png
  • Result:

VerschiebenErgebnisEN.png

See also: Detailed Information on Column Adjustments

Summary

  • In the Schedule, you have copied values via drag & drop from field to field, from field to column, and from column to column. You have also inserted, saved, and deleted records.

  • You have searched for a character string in the Schedule and filtered tasks by period and resource assignment. You have unhidden and hidden child data via the arrow symbol, double-click, and key combination.

  • In the Gantt module of the Projects panel, you have switched the module view, sorted by Manager, and adjusted the Phase, Effort, and Project name columns.

Documentation/Online Help

Information

  • The PLANTA Online Help is divided into 6 spaces.

Space

Key

Content

Introduction/Program Operation

INTRO

Here you will find basic information regarding the structure and operation of PLANTA project and, for example, answers to the questions:

  • How do I edit records?

  • What is a module?

  • How is the interface structured?

Project and Portfolio Management

PROJECT

Here you will find detailed information regarding the use of PLANTA project and PLANTA portfolio and, for example, answers to questions like:

  • How do I plan a project?

  • How do I create status reports?

  • How do I record my hours worked?

  • How do I work with linked systems, as for example PLANTA Hybrid?

Customizing

CU

Here you will find detailed information regarding the use of PLANTA customizer and, for example, answers to questions like:

  • How can I adjust a module?

  • How can I create a new module?

  • What do I have to consider when customizing the PLANTA software?

Interfaces

LINK

Here you will find detailed information regarding the use of PLANTA link and, for example, answers to questions like:

  • Which interfaces does PLANTA link offer?

  • How can I link PLANTA project and PLANTA pulse (PLANTA Hybrid)?

  • How can I adjust interfaces?

Technology/Installation

TEC

Here you will find technical information and information regarding installation and update of PLANTA project and, for example, answers to the questions:

  • Which system requirements do I have to take into account when setting up PLANTA project?

  • How can I update PLANTA project?

  • How can I keep my individual customizing when updating?

Agile (PLANTA pulse)

PULSE

Here you will find all information regarding PLANTA pulse and, for example, answers to questions like:

  • How do I create a board?

  • How do notifications work in PLANTA pulse?

  • Which system requirements do I have to consider when setting up PLANTA pulse?

Content

  • The individual help areas are structured thematically.

    • Via the start page of the respective help area you can navigate directly to the required topic.

  • In addition to the topic-related pages, there are object descriptions in which the modules and data fields of the PLANTA software are described.

    • The object descriptions can be opened from within the software and via links (see Access). However, they will be hidden in the table of contents.

Read and write permission

  • every PLANTA project user has read-only access to the complete PLANTA Online Help.

  • Only PLANTA employees have modification rights.

Open Documentation

Information

  • The PLANTA Online Help can be opened via browser or directly from within the software.

Open the PLANTA Online Help via browser

  • Enter https://help.planta.de/?l=en in your browser.

  • You are now on the entry page of the PLANTA Online Help (Image 1). Here, all available spaces are listed as individual boxes.

  • If you do not know yet in which space you will find the required information, you can use the search field on the entry page to search for a search term in all spaces.

  • If you are looking for information regarding PLANTA project, click on the Project and Portfolio Management box to open the start page of this help section (Image 2). Here, all the topics of the space are listed.

  • If you cannot find the required topic on the home page of the space, you can use the search field to search for a search term in the entire space.

  • If, for example, you are looking for information regarding basic data in PLANTA project, click on the General information and basic data box to open information on this topic (Image 3).

OnlineHilfeStartseiteEN.png

Image 1: Entry page of the Online Help

OnlineHilfeBereichEN.png

Image 2: Home page of the space

OnlineHilfeSeiteEN.png

Image 3: Example of a page

By clicking PLANTA Online Help in the upper left of the header you can return to the entry page from all spaces.

By clicking on the title of a space in the upper left of the header you can return to the home page of the space from the individual pages of the space.


Open the PLANTA Online Help from within the program

  • Open the description of a particular module:

  • Open the description of a particular data field:

    • Press F1 in the required data field or select the ? menu item. → Data field description (the data field must be focused via mouse-click).

  • Open the PLANTA Online Help start page

    • Press CTRL+M or select the ? menu item. → Open manual.

When you open the Online Help from within the software, the help version that corresponds to the software version you are using is opened automatically.

If you open the description of a module or a data field, the appropriate help area which contains the required module or data field will be opened automatically.

By clicking on the PLANTA Online Help on the left-hand side in the header of the Online Help you can switch to the start page if required in order to open another help area.


Note

  • If you press F1 or F2 on a field or in a module which is not contained in the standard program but which was customized individually in your system, only a notification page will be opened in the PLANTA Online Help, informing you that you are currently on an individual object.

Information

  • In the PLANTA Online Help, the search can be opened from three different places:

    • On the entry page, which is opened when opening https://help.planta.de/?l=en

      • If the search is started here, all spaces are searched

    • On the home pages of the individual spaces

      • If the search is started here, the currently opened space is searched.

    • On the individual pages of the space in the upper right

      • If the search is started here, the currently opened space is searched.

  • In the PLANTA - online help search field you can enter search terms in the form a string.

Details

  • When the search results are displayed, the information which space or version is being searched is also displayed.

    • If needed, another space or version can be selected in the according listbox.

    • To search all help areas and versions, you can select the All areas or All Versions option.

  • The results also contain the information in which space or version the search result can be found.

SuchergebnisseEN.png



See also: Detailed Information on the PLANTA Online Help