Access
-
PM Administration → Master Data → Project Settings → Model and Model Parameters
Information
-
In this module, the parameters are set/changed, which influence the planning or calculation of schedules (dates, costs, resource loading), e.g. Active today line, Time recording key date, Earned Value Analysis active, etc.
-
You can store several models with different settings. However, only one model can be activated (Active checkbox) and used.
Insert a new data model.
-
Right-click and select the Insert → Model Parameters command.
-
A new model is added to the license. All parameter settings are copied from the existing model.
-
-
Enter the name of the new model and save.
-
The ID of the model is generated automatically after saving.
-
-
Edit/change the required model parameters and save.
-
If the new model is to be used for scheduling, activate the Active checkbox.
-
As a result, a message will be displayed which indicates that the other currently active model is deactivated.
-